Skip to content

OERC · Odisha Electricity Regulatory Commission

TPWODL Licence Conditions, 2021

The Licence Conditions of TP Western Odisha Distribution Limited (TPWODL)

RegulationDated 26 Mar 2021In force from 1 Jan 2021No. OERC/Engg./2/2021/409 dated 26.03.2021

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software, from pages 1 to 32 of 41. Check the regulator's original before you rely on it.

OERC order No. OERC/Engg./2/2021/409 dated 26.03.2021 (p1) settles the licence conditions that now govern TP Western Odisha Distribution Limited (TPWODL), the company that took over the distribution and retail supply utility of the erstwhile WESCO. Pages 1–4 narrate the history — WESCO's 1999 licence, its deemed-licensee status under the 2003 Act, the finalisation of its licence conditions in 2006, the 2015 revocation of its licence and the APTEL and Supreme Court confirmation of that revocation (p1–3) — then record the competitive sale under s.20, the RFP of 14.08.2020, selection of Tata Power, incorporation of TPWODL with GRIDCO as the GoO-designated 49% holder, and delivery of the utility on 01.01.2021 (p2–3). The operative paragraphs amend the transferred licence conditions to reflect the RFP, TPCL's bid and the Vesting Order of 28.12.2020, fix a 25-year licence from 01.01.2021, require website publication and notices in one English and two Odia dailies, and reserve conflicts between the licence conditions, the Vesting Order and the RFP documents to the Commission (p4).

Pages 5–41 carry the licence conditions themselves. Part I (pp6–11) gives the short title, the area of supply, a definitions clause keyed to the 2003 Act and the Vesting Order, and the terms of the licence, including the express absence of exclusivity. Part II holds the general conditions: compliance with law and with load-despatch directions; the licensee's functions, including mandatory procurement from GRIDCO and open access; accounting separation and financial reporting; prohibition of undue preference; information and Major Incident reporting; business planning and investment approval; transfer of assets and encumbrances; licence fees, interest on default and suspension/revocation; amendment procedure; dispute resolution; Grid Code and Distribution Code compliance; consumer service codes, complaint handling, consumer rights statements and the grievance-redressal regime; distribution planning, security and operating standards; and the obligation to connect consumers and public lamps.

Standard name
Licensing Regulations
Primary topics
Licensing and licence conditions, Conditions of supply, Distribution system planning and operation

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of OERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document