This is Part-II (Annexure-I) of the CERC's tariff filing forms for hydro generating stations — the working templates a hydro generating company must use when filing a tariff petition for the 2024–29 period. It is not a statement of tariff principles; it is a checklist plus numbered forms telling a petitioner what to disclose and how to arrange the arithmetic.
Pages 2–4 are the checklist: FORM-1 to FORM-19, plus the audited accounts, loan agreements, approvals, DPR/CPM/PERT material, BPSA/PPA and other documents to be enclosed. The checklist also requires an electronic copy of the petition in Word, calculations in Excel, upload to the e-filing website and a pen drive/flash drive copy (p4).
The forms then run in sequence. FORM-1 to FORM-1(II) (pp5–9) summarise tariff and build the claimed capital cost, separating capital eligible for Return on Equity at the normal rate from capital eligible at the MCLR-linked rate; the form titles state the rate formula and ceiling, and the notes tie equity adjustment to the proviso to Regulation 18(3) of the 2024 Tariff Regulations (p9). FORM-2 (pp10–11) captures COD, station type, installed capacity, free power, design energy, auxiliary consumption, NAPAF and other normative parameters, including tax rate (with Regulation 31 cited for effective tax rate) and frequency-response data to be certified by RPC at truing up. FORM-3 (pp12–13) is the project salient-features template.
The capital-cost block is the largest: FORM-4/4A (pp14–16) for foreign loans and equity; FORM-5 (p17) for admitted capital cost of existing projects; the new-project cost estimate and commissioning schedule (pp18–19); FORM-5B (pp20–23), 5C (pp24–26) and 5D (p27) for break-ups by works, plant and packages; FORM-5Ei (pp28–32) and 5Eii (p33) for cost and time overruns; FORM-6 (p34) for the financing package up to COD; FORM-7 (pp35–36) and FORM-8 (pp37–38) for project-specific and corporate-loan allocation details. The notes define key loan terms and require refinancing, hedging and foreign-exchange details.
FORM-9A to 9F (pp39–47) deal with additional capitalisation after COD, de-capitalisation, reconciliation of ACE with books, exclusions, capital cost and CWIP. FORM-10 (p48) finances additional capitalisation; FORM-11 and 12 (pp49–50) calculate and state depreciation; FORM-13 to 13D (pp51–56) cover weighted-average interest on actual loans, interest on normative loan and working capital, non-tariff income and IEDC. FORM-14/14A (pp57–61) set out the draw-down schedule for IDC and financing charges and actual cash expenditure. FORM-15A/15B (pp62–65) give month-wise design energy and peaking/continuous MW. FORM-16 to 19 (pp66–69) cover liability flow, O&M expense, statutory charges and a summary of issues in the petition.
Useful thresholds appear in the notes: no ACE is to be claimed for assets individually costing below Rs. 20 lakh (p39), and if cost is certified by management rather than auditor, an auditor certificate is due within 90 days of filing (p19). The document frequently points to the 2024 Tariff Regulations for the operative norms, and several notes defer data to mid-term and final true-up.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.