Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Monitoring Performance of Distribution Licensees and State-owned Generating Company (Revision-I) Regulations, 2022

Madhya Pradesh Electricity Regulatory Commission (Monitoring Performance of Distribution Licensees and State-owned Generating Company) (Revision - I) Regulations, 2022

RegulationDated 22 Jul 2022No. -1514/MPERC/2022 dated 22nd July 2022

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MPERC's 2022 revision of its performance-monitoring framework, issued in Bhopal on 22 July 2022 under s.181(2)(ze) and related provisions of the Electricity Act 2003 read with s.55(2)(f) of the MP Vidyut Sudhar Adhiniyam 2000 (p1). It replaces the 2004 monitoring regulations and applies across Madhya Pradesh to distribution licensees and the state-owned generating company (p1, p3).

The operative text is short. Regulation 3 states the purpose: to monitor quality of supply and service standards against the operating norms set in the Commission's other regulations (p1). Regulation 4 is the working core — it obliges the utilities to file prescribed information in the attached formats every quarter, defines the four quarters, sets the filing deadline at 60 days after quarter-end, requires each utility to appoint a 'Reporter of Compliance', lets the Commission change or add formats, and requires upload on the Commission's MIS portal with login credentials, while hard-copy filing continues until the Commission orders otherwise (p1–2). Regulation 5 gives the Commission the right to use, publish or require display of the information; Regulations 6–8 preserve its powers to direct, relax and amend (p2–3). Regulation 9 is a savings clause coupled with repeal of the 2004 Regulations (p3).

Pages 4–5 list the MIS formats: six generation formats (Gen 1–6) for MP Power Generating Company Ltd covering thermal and hydro performance, coal details, fuel cost, coal linkage and generation loss/outages, and 24 distribution formats (D-1 to D-22) for MP Kshetra Vidyut Vitran Company Ltd covering sales/demand/collection KPIs, arrears, subsidy, metering and meter defects, losses, DT failures, accidents, net and gross metering consumers, HR, ECGRF, performance standards and SAIFI/SAIDI (p4–5).

Standard name
Compliance Audit and Furnishing of Information
Primary topics
Standards of performance, Losses and loss reduction, Metering

Read with this

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document