UPERC · Uttar Pradesh Electricity Regulatory Commission
General Conditions of Transmission Licence Regulations, 2005
Uttar Pradesh Electricity Regulatory Commission (General Conditions of Transmission Licence) Regulations No. UPERC/Secy.-05-931, dated December 14, 2005
RegulationDated 14 Dec 2005UPERC/Secy.-05-931 dated December 14, 2005
Summary
Summary written by software, from pages 1 to 32 of 40. Check the regulator's original before you rely on it.
These are the UPERC General Conditions of Transmission Licence Regulations, issued on 14 December 2005 under ss.16 and 181 of the Electricity Act 2003 (p1). They do two jobs: prescribe the procedure for applying for and granting an intra-state transmission licence in Uttar Pradesh, and set the continuing general conditions that apply once a licence is granted (p1, p8–14, p15–32). They bind all transmission licensees and deemed transmission licensees in their licensed areas, and apply to anyone wanting to transmit electricity in the state; no person may transmit without a licence or exemption (p1, p8). They come into force on Gazette publication.
Chapter 1 covers short title, commencement and interpretation; English prevails over Hindi in case of dispute (p1–2). Chapter 2 defines the licensing vocabulary, including deemed licensee, licensed business, other business, open access, STU, intervening transmission facilities, major incident and use of system (p3–8). Chapter 3 lays out the application process: Form-I and fee, draft licence contents, acknowledgement, acceptance and a 90-day decision target, newspaper advertisement, objections, local inquiry and hearing, approval and notification, licence duration of 25 years, and deposit of maps and printed copies (p8–14).
Chapter 4, the core, sets general licence conditions. It specifies compliance duties, the licensee’s functions including non-discriminatory open access, prohibited activities, obligations to provide connectivity, use of intervening transmission facilities, technical codes and performance standards, load scheduling and dispatch, ring-fencing of Other Business, major incident reporting, information and extraordinary-situation reporting, approval for transfers of assets above Rs. 100 lakh, accounts and audit, investment plans and business plan, licence fees, investigation and revocation (p15–32). Pages 33–40 are not provided.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of UPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.