GERC · Gujarat Electricity Regulatory Commission
Gujarat Power System Management Standards, 2005
Gujarat Electricity regulatory Commission (Gujarat Power System Management Standards) 2005
StandardsDated 30 Mar 2005
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Gujarat Electricity Regulatory Commission (Gujarat Power System Management Standards) 2005 is a principal GERC instrument made under s.42(b) of the Gujarat Electricity Industry (Reorganisation and Regulation) Act, 2003 (p1). It extends to the whole of Gujarat and is to come into force on Gazette publication; the Gazette date is not printed, though the text is signed at Ahmedabad on 30 March 2005 (p1–2, p34).
Section 1 (pp2–4) explains that the Standards are guidelines for operating and managing generation, transmission and distribution and are supplemental to the Grid Code. It adopts Grid Code definitions, gives SLDC full control of real-time operations, requires users to report compliance difficulties and empowers SLDC to act on repeated non-compliance, and directs licensees to follow CEA standards under s.73 of the Electricity Act 2003.
Section 2 (pp5–13) covers power generation management: outage planning and SLDC release (with a 5 MW threshold for units/CPPs), day-ahead availability declarations and generation scheduling/despatch, frequency management including backing-down, islanding and manual load shedding steps, voltage and reactive power management, black-start preparedness, despatch instruction formats and communication, AVR/governor obligations, and monitoring through SCADA.
Section 3 (pp14–22) covers transmission system management: data collection and system studies, SLDC/STU load despatch functions, communication links, reactive and voltage management, demand management, load shedding, islanding schemes, post-disturbance analysis, event reporting timelines, outage planning, protection coordination, short-circuit information, on-load tap changing, safety coordination, maintenance, spares, testing laboratories/organisation, tools and inspection.
Section 4 (pp28–34) covers distribution system management: demand and supply scheduling, load monitoring, balancing of distribution transformer loads, voltage monitoring, data logging and records, restoration/load management, communication, safety and detailed maintenance requirements (inspection, preventive maintenance, overhauls, off-schedule inspections).
Annexure-1 (pp23–27) prescribes the data formats for operation and studies, covering line, transformer, bus, machine, demand and real-time data.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.