HERC · Haryana Electricity Regulatory Commission

Minimum Information to be maintained by Licensee or Generating Company Regulations, 2007

Haryana Electricity Regulatory Commission (Minimum Information to be maintained and the Manner in which such Information is to be maintained by the Licensee or the Generating Company) Regulations, 2007

RegulationDated 29 Nov 2007Regulation No. HERC/ 16 / 2007 dated The 29th November, 2007

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Haryana Electricity Regulatory Commission's 2007 Minimum Information Regulations are a record-keeping rulebook for licensees and generating companies in the State. Framed under s.181(1) and (2)(zm) of the Electricity Act 2003 and tied to s.128(8) — investigation of a licensee's affairs — they require books and records detailed enough for an Investigating Authority to do its job (p1–2).

Regulation 3 is the core. It lists what must be kept: audited accounting statements and sub-accounts; technical and commercial information on transmission and distribution losses, cost to serve by consumer category, voltage level and time of day, and the data needed for Multi Year Tariff, Availability Based Tariff and Time of Day tariffs; and a long schedule of technical parameters running from load forecasts, load curves, feeder and transformer counts and meter health through maintenance and overhauling registers to unit-wise generation performance, tripping records and fuel consumption (p2–4). It also covers the audit types to be conducted, equipment-failure and grid-disturbance investigations, line breakdowns, consumer complaints and surveys, accidents and compensation, new connections and disconnections, theft cases, stores, billing and receivables, and human resources (p4). Formats must be uniform and standard, devised by the licensee with the Commission's approval, kept in hard and soft form, at intervals ranging from quarter-hourly to yearly (p4).

Regulation 4 gives existing licensees and generating companies thirty days from commencement to file a tabular statement of what information they hold and how, with new entrants following the same procedure unless the Commission approves a change (p4–5). Regulations 5 to 7 preserve the Commission's powers to issue directions, amend the regulations and remove difficulties (p5).

The text appears twice: pages 1–5 carry a notification dated 29 November 2007 signed by two Members and the Chairman, while pages 6–10 repeat the identical regulation dated 7 November 2007, signed by the Secretary (p1, p6, p10). Commencement is on Gazette publication; the Gazette date is not printed.

Standard name
Compliance Audit and Furnishing of Information
Primary topics
Compliance and reporting

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.