CSERC · Chhattisgarh State Electricity Regulatory Commission
Intra-State Deviation Settlement Mechanism and Related Matters Regulations, 2025 — Draft
Chhattisgarh State Electricity Regulatory Commission (Intra-State Deviation Settlement Mechanism and Related Matters) Regulations, 2025
Draft regulationDated 28 Dec 2024No. D-20/CSERC/2025 dated 28/12/2024
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is the draft CSERC (Intra-State Deviation Settlement Mechanism and Related Matters) Regulations, 2025, issued by the Chhattisgarh State Electricity Regulatory Commission under s.181 read with s.86(1)(c) of the Electricity Act, 2003 (p1). It is dated 28/12/2024, carries number D-20/CSERC/2025, and states it will be effective from 01.04.2025 (p1). It applies within Chhattisgarh to inter- and intra-State entities connected with the State Transmission Utility, and it will repeal the 2016 intra-state ABT/DSM Regulations from commencement, with a savings clause for actions already taken (p1, p22).
The bulk of the draft is a complete rulebook for intra-state deviation settlement. Regulations 1–3 set the title, extent, commencement, objective and definitions (pp1–6). Regulation 4 describes the ABT framework as three tariff components — fixed/capacity, energy/variable and deviation — and links capacity and energy charges to the 2021 CSERC tariff regulations (p6). Regulation 5 sets out who is covered by Intra-State ABT: State generating stations, conventional and captive plants, biomass and hydro plants, wind/solar/hybrid plants above the stated threshold, distribution licensees, open access and captive users, with special rules for sellers supplying only SSC/MSC or outside the State and an exemption for certain wind/solar/hybrid plants commissioned between 04.10.2019 and 27.12.2023 (pp6–7). State-owned hydel stations are excluded because their water discharge is regulated by the Water Resources Department (p6).
Regulation 6 is the core: it gives deviation computation formulas for general sellers, WS sellers/QCA, other RE sellers and buyers (pp7–8); links the normal rate to the WRPC DSM statement issued to CSPDCL (p8); and sets out the charge structure for unscheduled generation, open-access transactions, frequency-linked seller and buyer charges, volume limits, and special treatment for hydro, MSW, biomass, WS sellers, standalone ESS and WS-with-ESS (pp8–14). It also leaves the 'X' factor for WS seller deviation after 31.03.2026 to be prescribed by CERC (p8).
Regulation 7 covers scheduling and despatch: daily declared-capacity and requirement timelines, STOA approval and payment sequencing, revision limits, grid disturbance and curtailment, RE generator revisions, and consequences for excess scheduling (pp14–18). Regulation 8 deals with energy accounting at the drawl point for single-supply and multiple-supply consumers, including surplus RE sale, banking and MSC billing (pp18–19). Regulation 9 establishes the State Deviation Settlement Mechanism Account, weekly or monthly billing cycles, meter reading, implemented schedule, bill preparation, the State Deviation Pool Account, payment timelines, default interest and Letter of Credit requirements (pp19–21). Regulations 10–12 are the standard power to relax, savings and repeal, and power to remove difficulties (p22).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.