Skip to content

HERC · Haryana Electricity Regulatory Commission

Forecasting, Scheduling and Deviation Settlement for Solar and Wind Generation Regulations, 2019

Haryana Electricity Regulatory Commission (Forecasting, Scheduling and Deviation Settlement and related matters for Solar and Wind Generation) Regulations, 2019.

RegulationDated 29 Apr 2019No. 44/2019/HERC. dated The 29th April, 2019

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is HERC’s 2019 principal regulation for integrating solar and wind generation into Haryana’s intra-state grid through forecasting, scheduling and deviation settlement (p1–2). It opens with a Statement of Object and Reasons explaining SLDC’s section 32 mandate, ABT/DSM background, open access, FOIR recommendations and compatibility with inter-state accounting (p1–2). The operative text is made under sections 66, 86(1)(b), 86(1)(e) and 181 read with sections 32 and 33 of the Electricity Act, 2003 (p2).

Part A (pp2–5) sets commencement, definitions, objective and applicability. The regulation applies to wind and solar generators connected to Haryana’s intra-state transmission or distribution system, including pooling sub-stations and self-consumption or sale within or outside the state, subject to a combined installed capacity threshold of not less than 1 MW at a pooling sub-station or individual generator (p5). A Qualified Co-ordinating Agency (QCA) must be appointed and registered with SLDC.

Part B (pp5–9) is the Forecasting and Scheduling Code: day-ahead and week-ahead forecasts, intra-day revisions, telemetry and metering, QCA registration and duties, SLDC forecasting, and gaming treatment. Part C (pp9–11) contains commercial arrangements: deviation settlement for intra-state sales and self-consumption through absolute-error bands and the state deviation pool; separate treatment for inter-state and outside-Haryana transactions under the Annexure; and separate accounts for inter- and intra-state transactions. Part D (pp11–14) covers implementation: metering, weekly energy accounting, IT-enabled communication, deviation accounting and billing, payment security and interest for delay, curtailment intimation, and de-pooling. Part E (p14) provides practice directions and powers to amend, remove difficulties and relax. The Annexure (pp15–16) sets the framework for deviation charges for generators selling or consuming power outside Haryana, including PPA/APPC fixed rates and REC-based balancing of deemed RPO. The regulation is to be reviewed after two years (p5).

Standard name
Forecasting, Scheduling and DSM for Wind and Solar
Primary topics
Scheduling and despatch, Deviation settlement (DSM), Energy accounting and settlement

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on herc.org.in ↗

Report an issue with this document