Summary
Summary written by software. Check the regulator's original before you rely on it.
The West Bengal Electricity Regulatory Commission (Fees) Regulations, 2013 (Notification No. 60/WBERC, p1) replace the Commission's 2007 fee regulations and set out what an applicant must pay to file anything before the Commission. Regulations 1-2 (p1-2) give the short title, extend the regulations to West Bengal, bring them into force on publication in the official Gazette, and define 'Applications' broadly to cover petitions, complaints, appeals, replies, rejoinders and supplemental pleadings filed under the Conduct of Business Regulations.
Regulation 3 (p2) is the operative charging provision: every application must carry the fee specified in Schedule-I, normally by bank draft, banker's cheque or pay order drawn in favour of the Commission and payable at Kolkata, with cash permitted only up to a small ceiling and cheque allowed for licensees and generating companies. Regulations 4-6 (p2) reserve to the Commission the power to amend the regulations, to remove difficulties by written order, and to dispense with any requirement or reduce fees in specific cases. Regulation 7 (p2) repeals the 2007 Fees Regulations with a saving clause deeming prior actions valid; Regulation 8 preserves the Commission's inherent power to make orders to meet the ends of justice or prevent abuse of its process.
Schedule-I (p3-7) is the substance of the document: a twenty-item fee table covering tariff and Annual Performance Review filings by distribution and transmission licensees, generating-station and transmission-investment approvals, power purchase agreements (long-term and short-term), open-access and surplus-capacity disputes, review petitions, inspection of documents and certified copies, rectification of orders, and appeals under s.127(1). Fees are either unit-based (per kWh sold, wheeled or transmitted; per MW of installed or contracted capacity) with minimums and maximums, or flat amounts; two entries leave the fee to be fixed case-to-case or at the Commission's discretion.
Read with this
Amendments and corrections
- Dated 6 Jan 2025Fees (Amendment) Regulations, 2025
Earlier drafts
- Released with the notice dated 27 Nov 2024Fees (Amendment) Regulations, 2024 — Explanatory Memorandum — Draft
- Dated 27 Nov 2024Fees (Amendment) Regulations, 2024 — Public Notice Inviting Comments
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.