Skip to content

MSERC · Meghalaya State Electricity Regulatory Commission

Rooftop Solar Grid Interactive Systems Based on Net Metering Regulations, 2015 — First Amendment, 2024 — Draft

Meghalaya State Electricity Regulatory Commission(Rooftop Solar Grid Interactive Systems Based on Net Metering) (First Amendment) Regulations, 2015 (1 of 2024)

Draft amendmentDated 25 Sep 2024MSERC/RSG/2015/ dated The 25thSeptember 2024

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Meghalaya State Electricity Regulatory Commission issued this pre-publication notification on 25 September 2024, proposing the first amendment to its Rooftop Solar Grid Interactive Systems Based on Net Metering Regulations, 2015 (p1). Suggestions are invited within 30 days of the notice, and the amendment is stated to take effect on publication in the Gazette of Meghalaya Extra Ordinary, whose date is not printed (p1).

The draft rewrites four provisions. Regulation 2 (Chapter I) restates the definitions used across the regulations — consumer, eligible consumer, prosumer, contracted load, premises, settlement period, generation meter and the four metering arrangements: net metering, gross metering, group net metering and virtual net metering (p1–3).

Regulation 5 governs how much net-metering capacity a distribution licensee must offer, tying the ceiling to a target capacity the Commission may fix, a minimum installation size at consumer premises, an annual cumulative ceiling in the licensee's area and a share of the distribution transformer's peak capacity (p3).

Regulation 7 covers interconnection: technical standards and safety follow CEA norms or a competent authority to be notified, pending which the Electricity Supply Code applies; it allocates operation and maintenance responsibility between consumer and licensee, allows the licensee to disconnect on safety grounds, and requires meters to comply with the CEA Meter Regulations, be procured, tested, installed and maintained by the licensee, and to record time-of-day generation and consumption where TOD tariff applies (p3–4).

Regulation 8 is the largest part, prescribing energy accounting and settlement for net metering, gross metering, group net metering and virtual net metering — credit carry-forward within a settlement period, TOD time-block compensation, treatment of generation exceeding a share of consumption at settlement-period end, eligibility bands for group and virtual metering, credit-sharing ratios and their revision windows, and payment for unadjusted credits at rates the Commission determines (p4–6). It also addresses accounting when a meter fails (p6) and routes billing disputes to the consumer grievance redressal forum and then to the Commission (p6).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Gross metering, Billing and payment

Read with this

Voltaic holds no final regulation made from this draft.

No other documents to read with it are on Voltaic.

Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mserc.gov.in ↗

Report an issue with this document