Skip to content

NERC · Nagaland Electricity Regulatory Commission

Methodology for determination of Green Energy Open Access Charges Regulations, 2024

Nagaland Electricity Regulatory Commission (Methodology for determination of Green Energy Open Access Charges) Regulations, 2024

RegulationDated 30 Sep 2024No. NERC/REGN/T-15/2021 (Part-II) dated 30th Sept, 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on nerc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Nagaland Electricity Regulatory Commission issued these regulations on 30 September 2024 to lay down how Green Energy Open Access charges are to be determined in Nagaland (p1–2). They apply across the State and come into force from the date of notification in the Official Gazette; the Gazette date itself is not printed (p2).

Chapter 1 covers preliminaries, including the objective, definitions, and the scope of Green Energy Open Access. It defines eligibility as consumers with contracted demand or sanctioned load of 100kW or more, excluding captive consumers (p2–5). “Green Energy” is defined by reference to renewable sources, hydro, renewable storage and green hydrogen/ammonia mechanisms, and the Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022 (p3–4).

Chapter 2 specifies the charge heads: transmission charges, wheeling charges, cross-subsidy surcharge, standby charges, banking charges, and other charges such as SLDC fees, scheduling charges and RE-DSM (p5). It sets out the methodology for long/medium-term and short-term transmission charges, including treatment of multiple transmission licensees, dedicated systems and 52-week transmission losses (p6–8). Similarly, it gives the wheeling charge methodology, HT/LT segregation, technical loss treatment, and the rule that transmission and wheeling charges/losses are levied only once (p9–12). Cross-subsidy surcharge follows the Tariff Policy 2016 formula and is subject to exemptions and a cap (p12–14). Standby arrangements and charges are specified for generator/transmission outages (p14–15). Banking is permitted at least monthly, with charges adjusted in kind, TOD-slot restrictions, lapsing of unutilised energy and REC entitlement (p15–16). Other charges are left to relevant Commission regulations (p16).

Chapter 3 gives the Commission powers to issue directions, relax provisions, amend the regulations and remove difficulties (p17–18).

Standard name
Green Energy Open Access Regulations
Primary topics
Green energy open access, Open access charges, Energy banking

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of NERC's website on 1 Oct 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on nerc.org.in ↗

Report an issue with this document