Summary
Summary written by software. Check the regulator's original before you rely on it.
The Nagaland Electricity Regulatory Commission issued these regulations on 30 September 2024 to lay down how Green Energy Open Access charges are to be determined in Nagaland (p1–2). They apply across the State and come into force from the date of notification in the Official Gazette; the Gazette date itself is not printed (p2).
Chapter 1 covers preliminaries, including the objective, definitions, and the scope of Green Energy Open Access. It defines eligibility as consumers with contracted demand or sanctioned load of 100kW or more, excluding captive consumers (p2–5). “Green Energy” is defined by reference to renewable sources, hydro, renewable storage and green hydrogen/ammonia mechanisms, and the Electricity (Promoting Renewable Energy Through Green Energy Open Access) Rules, 2022 (p3–4).
Chapter 2 specifies the charge heads: transmission charges, wheeling charges, cross-subsidy surcharge, standby charges, banking charges, and other charges such as SLDC fees, scheduling charges and RE-DSM (p5). It sets out the methodology for long/medium-term and short-term transmission charges, including treatment of multiple transmission licensees, dedicated systems and 52-week transmission losses (p6–8). Similarly, it gives the wheeling charge methodology, HT/LT segregation, technical loss treatment, and the rule that transmission and wheeling charges/losses are levied only once (p9–12). Cross-subsidy surcharge follows the Tariff Policy 2016 formula and is subject to exemptions and a cap (p12–14). Standby arrangements and charges are specified for generator/transmission outages (p14–15). Banking is permitted at least monthly, with charges adjusted in kind, TOD-slot restrictions, lapsing of unutilised energy and REC entitlement (p15–16). Other charges are left to relevant Commission regulations (p16).
Chapter 3 gives the Commission powers to issue directions, relax provisions, amend the regulations and remove difficulties (p17–18).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of NERC's website on 1 Oct 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.