Conduct of Business Regulations, 2005 — 6th Amendment, 2023

Punjab State Electricity Regulatory Commission (Conduct of Business) (6th Amendment) Regulations, 2023

AmendmentDated 2 Jun 2023Published in the Gazette 5 Jun 2023No. PSERC/Secy/Regu.175. dated The 2nd June, 2023

Amends the Conduct of Business Regulations — Contents.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the sixth amendment to the PSERC (Conduct of Business) Regulations, 2005, issued by the Punjab State Electricity Regulatory Commission under Section 181 of the Electricity Act, 2003 (p1). It makes two substantive changes to the Principal Regulations and takes effect from gazette notification (p1).

The first change rewrites Regulation 55(1) on revision of tariff: no tariff determined by the Commission may be amended more than once in a financial year, with the sole exception of adjustments under the Fuel and Power Purchase Adjustment Surcharge (FPPAS) formula (p1). The second substitutes Appendix 7 in full, replacing the Fuel Cost Adjustment formula with a detailed FPPAS mechanism (p1–4).

Appendix 7 defines FPPAS as the change in power-supply cost from fuel cost, power purchase cost and transmission charges relative to approved cost of supply, and requires the distribution licensee to compute and bill it automatically each month, subject to annual true-up (p2). It fixes the (n+2)th-month billing lag for variations in the nth month, a forfeiture rule if the licensee misses that timeline (force majeure excepted), a carry-forward option capped in duration and triggered by a per-unit threshold, a carrying cost based on the SBI MCLR plus a margin, and a recovery split that depends on whether FPPAS crosses a percentage threshold of the tariff (p2). It sets true-up filing and disposal deadlines, treatment of excess and under recovery, publication and billing-system obligations, and a full algebraic formula with defined inputs covering power purchase cost, transmission charges, losses and average billing rate (p2–4). It also excludes deviation settlement charges from power purchase cost and routes ancillary services and SCED charges to true-up (p3–4). A closing note lists the Principal Regulations and the first five amendments (p4).

Standard name
Conduct of Business Regulations
Primary topics
Fuel and power purchase cost adjustment, Tariff determination, ARR and true-up

Read with this

The regulation

Procedures and orders made under it

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document