Skip to content

TSERC · Telangana State Electricity Regulatory Commission

Demand Side Management Regulation, 2020

Telangana State Electricity Regulatory Commission (Demand Side Management) Regulation, 2020

RegulationDated 24 Nov 2020Published in the Gazette 26 Nov 2020No.TSERC/ 01 /2020 dated 24.11.2020

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Telangana State Electricity Regulatory Commission (Demand Side Management) Regulation, 2020 is a principal regulation made by TSERC under clause (zp) of s.181(2) of the Electricity Act, 2003 (p1). It applies to every distribution licensee in Telangana — expressly including deemed distribution licensees and those exempted from holding a distribution licence — in its own area of supply (p2). It came into force on publication in the Telangana Gazette, printed as 26 November 2020, two days after the notification was signed (p1–2).

Clause 1–2 (p2–3) carry the title, applicability and commencement, and define the working vocabulary — DSM, baseline data, load management, load research, DSM resource acquisition, energy service company, evaluation/measurement/verification and the Bureau.

Clauses 3–5 (p3–4) set the frame: licensees must make DSM integral to day-to-day operations to lower the cost of electricity to consumers and to the licensee, control and shift demand and cut T&D losses; the Commission fixes DSM targets per licensee, taking account of consumer mix and load profile, after the licensee's assessment of DSM technical potential, which is tied to the licensee's MYT Control Period cycle with compressed deadlines for the first assessment.

Clauses 6–17 (p4–8) set out the machinery. Each licensee must constitute a DSM Cell with defined responsibilities, carry out load and market research to build baseline data, file a perspective DSM Plan for the Control Period plus rolling annual plans with the Annual Performance Review, and obtain Commission approval of the plan and of each individual programme document before implementing anything. The regulation specifies what a programme document must contain, how net incremental costs are identified and proposed for recovery through tariff or another mechanism, when cost recovery is refused, how monitoring and six-monthly progress reporting work, and what a programme completion report must cover. Evaluation, measurement and verification may be done by the Commission or a third-party agency, with the EM&V plan approved before implementation, and incentives are left to the Commission's discretion.

Clauses 18–23 (p8–9) are the housekeeping powers — amendment, directions, relaxation, removal of difficulties, a savings clause preserving the Commission's inherent procedural powers, and conduct of inquiries through the Conduct of Business Regulations.

Standard name
Demand Side Management and Demand Response
Primary topics
Demand-side management and demand response

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of TSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document