Explanation for the Notification on Escalation Factors and Other Parameters for Tariff Based Competitive Bidding for Transmission Service, 2017

EXPLANATION FOR THE NOTIFICATION ON ESCALATION FACTORS AND OTHER PARAMETERS FOR TARIFF BASED COMPETITIVE BIDDING FOR TRANSMISSION SERVICE, DATED 05.10.2017

Explanatory memorandum to a draftDated 5 Oct 2017

Draft

Voltaic holds no final regulation made from this draft.

Explanatory memorandum to the draft Transmission Service Escalation Rates Notification, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's explanatory note accompanying its 5 October 2017 notification of escalation factors and other parameters for tariff-based competitive bidding for transmission service (p1). It exists because Clause 3.3.1.3(a) of the Standard RFP and Schedule 7 of the Standard Transmission Service Agreement require the Commission, every six months, to fix three things: an annual escalation rate applied to bidders' quoted escalable transmission charges for bid comparison, a discount rate for levelising those charges for comparison, and an annual inflation rate applied to escalable transmission charges for actual payment (p1). The rates notified here apply to the half-year 01.10.2017–31.03.2018 (p1).

Section 3.1 (p2–3) builds the evaluation escalation rate from a 45:55 WPI–CPI composite series over 2005 to 2016 using an exponential growth formula, notified at 7.54% (p3). Section 3.2 (p3–5) derives the discount rate as a weighted average cost of capital — 70:30 debt-equity per the CERC Tariff Regulations 2014-19, corporate tax at the basic rate in the 2017-18 Union Budget, market interest as the 2016 average base rate of five major banks plus 350 basis points, risk-free rate from 10-year GOI securities, beta from BSE power-sector indices against Sensex — notified at 10.06% (p4–5). Section 4 (p5) computes the payment inflation rate from WPI (new series, 2011-12 base) and CPI for July 2016 to June 2017 by comparing half-yearly average indices, notified at -0.03% (p5).

Paragraph 5 (p6) points readers to the explanation issued for the 1 February 2012 notification for further detail on data sources and on how the inflation rate is applied for payment.

Primary topics
Transmission tariff, Competitive bidding

Read with this

Voltaic holds no final regulation made from this draft.

Proposed changes (drafts with no final yet)

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document