GERC · Gujarat Electricity Regulatory Commission

Gujarat Electricity Grid Code, 2026

Gujarat Electricity Regulatory Commission (Gujarat Electricity Grid Code) Regulations, 2026

RegulationDated 7 Oct 2026Published in the Gazette 7 Oct 2026Notification No. 09 of 2026 dated OCTOBER 7, 2026

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Gujarat Electricity Regulatory Commission's Gujarat Electricity Grid Code, 2026 (Notification No. 09 of 2026, gazetted 7 October 2026) is a wholesale replacement of the State's 2013 grid code. It applies only to intra-State entities; for the inter-State network the CERC's Indian Electricity Grid Code governs (p1). It comes into force on gazette publication, supersedes the Gujarat Electricity Grid Code, 2013 dated 16 July 2013, and carries a savings clause preserving action already taken under the old code (p1, p122).

Chapter 1 restates the statutory allocation behind the Code — the STU as transmission planner and open-access provider, the SLDC as apex system operator — and lists 32 objectives running from standardised connectivity, protection, metering and commissioning to scheduling, reserves, restoration and safety (pp2–4). It fixes implementation duties (STU/SLDC implement; users must comply and report any difficulty; persistent non-compliance can lead to disconnection) and states the Code's limits: unforeseen conditions are handled by the system operator, subject to ratification by the Commission, and disputes go to the Commission (p6). Chapter 2 is a long dictionary of defined terms (pp6–23). Chapter 3 elaborates the roles of the STU, SLDC, three Sub-SLDCs (Gandhinagar, Jambuva, Jetpur), an expected Distribution System Operator inside each distribution licensee, and the composition and functions of the State Operation Coordination Committee and the Protection Coordination Committee (pp23–26).

Chapter 4 is the Resource Planning Code: demand forecasting by distribution licensees and the STU, generation resource adequacy with a non-compliance charge and a proviso that future Resource Adequacy Regulations prevail, and transmission planning — a perspective rolling ten-year plan published each year, planning data, planning philosophy, modelling and scenario assumptions, planning margins, power-flow/short-circuit/stability/EMT/inertia studies, N-0/N-1/N-1-1 reliability criteria, substation criteria, reactive compensation, and electrical clearances (pp26–47). Chapter 5 sets the Connection Code: standards to be complied with, the connection procedure and agreement, technical requirements (reactive compensation, data and communication, recording instruments, safety, cyber security, RE/ESS connectivity and harmonics), metering for open access and commissioning timelines (pp47–51). Chapter 6 is the Protection Code — uniform protocol, PCC oversight, setting approval and central database, annual internal and five-yearly third-party audits, performance indices and system protection schemes (pp51–54).

Chapter 7 governs commissioning: start-up power and infirm-power injection windows tied to first synchronization and first-time charging, data to be furnished before trial run, notice periods, technology-specific trial-run regimes, documents and tests before COD, certificates, declarations and COD/DOCO rules including deemed COD for competitively bid transmission (pp54–63). Chapter 8, the longest, is the System Operation Code: operating philosophy, demand and generation estimation with a submission timetable, outage planning, demand control and load shedding, system security, frequency control, ancillary reserves and the inertia/primary/secondary/tertiary control hierarchy, operational planning studies, system restoration, metering and protection, monitoring of generation and drawal, real-time system states, post-despatch analysis and event-reporting timelines, reactive power management and periodic testing (pp63–89).

Chapter 9 mandates flexible operation of coal/lignite units per the CEA's 2023 Regulations and sets a technical-minimum schedule with a part-load compensation route (pp89–90). Chapter 10 is the Scheduling and Despatch Code — control-area jurisdiction, duties of SLDC, sellers and buyers, declared capacity and entitlements, ramping, hydro optimisation, SCUC/SCED, revision and curtailment rules, metering and energy accounting, VAr pricing and settlement, and late-payment consequences (pp90–108). Chapters 11–13 cover cross-boundary safety and Line Clear Permits (pp108–110), communication, RTU/PMU protocols, real-time data schedules and cyber security (pp110–117), and incident/accident reporting, warnings and loss of communication (pp117–120). Chapter 14 sets self-audit and third-party compliance audit and the consequences of non-compliance (pp120–121); Chapter 15 covers review, power to relax, power to remove difficulties, repeal and savings, and a clause stating the Code is not to be treated as 'change in law' in contracts (pp121–122). Eight annexures and two schedules carry planning-data templates, audit formats, the frequency-response methodology, protection standards, Line Clear Permit forms, the cyber-security architecture and connectivity standards (pp127–150).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Connectivity and GNA, Scheduling and despatch

Read with this

Commencement notices and reasons

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.