Furnishing of Technical Details by Generating Companies Regulations, 2012

Assam Electricity Regulatory Commission (Furnishing of Technical Details by Generating Companies) Regulations, 2012

RegulationDated 31 Mar 2012No. AERC.26/2012/. dated The 31st March, 2012

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is AERC's notification requiring every generating company in Assam to file technical data on its generating stations with the Commission on a recurring basis (p1–3). It is made under s.181 read with s.10(3a) of the Electricity Act, 2003, and the Commission explains it as Assam's counterpart to CERC's 2009 regulations on the same subject, extended to cover thermal and hydro generators plus the renewable categories — biomass, biogas, bagasse cogeneration, small hydro, solar PV and solar thermal (p2). It applies across the whole State and takes effect on Gazette publication, a date not printed in the text (p1).

The operative part is short. Regulation 4 is the core: an operating or under-construction generating company must give up-to-date details on the prescribed forms, separately for each stage of the station, showing status as on 1 April, by 30 April each year, with a soft copy (p2–3). Two provisos set earlier deadlines for new projects — non-renewable stations file first at least three years before the projected commercial operation date of the first unit, while renewable stations file immediately on finalisation and no later than six months before scheduled commissioning (p3). Regulations 5 to 7 are boilerplate: the Commission's power to remove difficulties by order, to amend the regulations, and savings clauses preserving its inherent and statutory powers (p3).

The bulk of the document — pages 4 to 21 — is the reporting formats themselves, one per station type, laid out as numbered field lists covering ownership, location, capacity and unit configuration, commercial operation dates, beneficiary and merchant-capacity shares, evacuation arrangements, equipment manufacturers, fuel and calorific values, steam and cycle parameters, guaranteed heat rate and efficiency, cooling and site conditions, hydrology, wind or solar resource parameters, and estimated project cost (p4–21). Footnotes under each form define beneficiary, merchant capacity, target beneficiary and design energy by reference to other AERC regulations, and require an electronic copy (p6, p9, p11, p15, p17).

Standard name
Compliance Audit and Furnishing of Information
Primary topics
Compliance and reporting

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of AERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.