OERC · Odisha Electricity Regulatory Commission
Grid Interactive Distributed Renewable Energy Sources Regulations, 2026 — Draft
Odisha Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026
Draft regulationDated 3 Aug 2026OERC/RA/RCO-DRES-43/2026/1032 dated 03.08.2026
Draft
A proposal that has since been finalised as the Grid Interactive Distributed Renewable Energy Sources Regulations, 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This document is OERC's pre-publication package for the draft Odisha Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2026. The Statement of Reasons (p1) explains that the Commission had published a combined draft on Renewable Consumption Obligation, Distributed Renewable Energy Sources and Renewable Energy Linked Concepts on 10.04.2026; after stakeholder comments it found RCO and DRES to be distinct matters and withdraws that combined draft. It also cites the 19.08.2016 Net-Metering/Bi-Directional Metering Order, later amendments, advances in distributed renewable integration and metering, and a FOR model regulation as reasons for the new draft. The Public Notice (p2) pre-publishes the new draft under Section 181(3) of the Electricity Act, 2003 and invites objections/suggestions by 31.08.2026.
The draft Regulations (pp3–24) would apply in the whole State of Odisha. Chapter I (pp3–7) gives short title and commencement from Gazette publication, defines DRES as a distributed renewable generation system up to 10 MW connected at 33 kV or below with anti-islanding protection, and sets scope, eligibility, BESS/inverter requirements and agreement obligations. Regulations 4–10 (pp8–12) create six metering mechanisms — Net Metering, Net Billing, Gross Metering, Group Net Metering, Virtual Net Metering and Behind the Meter — each with eligible consumer categories, location, capacity bands and switching rights. Regulations 11–16 (pp12–19) prescribe energy accounting and billing for each mechanism, including carry-forward, settlement period, ToD treatment, bill disclosures and settlement at feed-in tariff. Regulation 17 (p19) deals with charges and exemptions; Regulation 18 (p19) meter defects; Regulation 19 (p20) hosting capacity limits for feeders and transformers; Regulation 20 (pp20–21) technical and safety standards for interconnection; Regulation 21 (p21) commissioning; Regulation 22 (p21) RPO/RCO treatment; Regulation 23 (p22) meters; Regulation 24 (pp22–23) application process and DISCOM obligations; Regulation 25 (p23) REC eligibility; and Regulations 26–32 (pp23–24) give overriding effect and Commission powers to issue directions, remove difficulties, relax, amend and interpret.
Read with this
The regulation
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.