MERC · Maharashtra Electricity Regulatory Commission
Specific Conditions of Distribution Licence (Gigaplex Estate IT & ITES SEZ, Airoli) Regulations, 2015
Maharashtra Electricity Regulatory Commission (Specific Conditions of Distribution Licence applicable to M/s. Gigaplex Estate Pvt. Ltd., for IT & ITES SEZ at Airoli Knowledge Park, TTC Industrial Area, Airoli, Dist. Thane) Regulations, 2015.
RegulationDated 17 Dec 2015No.MERC/TEC/Licence Conditions/GEPL/2015 dated 17th December 2015
2 amendments to it are on Voltaic, the latest dated 20 Sep 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a project-specific MERC regulation that fixes the distribution licence conditions for a single licensee: M/s. Gigaplex Estate Pvt. Ltd. (GEPL), the developer-licensee of the IT & ITES SEZ at Airoli, Thane (p1). It is made under the Electricity Act 2003 licensing provisions and is deliberately narrow — rather than restating a full licence code, it sets a handful of site-specific conditions and deems them, together with MERC's General Conditions of Distribution Licence Regulations, 2006, to be GEPL's licence (p1).
Paragraphs 1–3 establish the title, extent and commencement, define the key terms (Act, Developer, Deemed Distribution Licensee, General Conditions, GEPL, SEZ Act, SEZ Rules), and state that these Specific Conditions plus the General Conditions govern GEPL's distribution and retail supply operations (p1). Commencement is tied to publication in the Official Gazette, whose date is not printed (p1).
Paragraph 4 defines the area of supply — the whole 11.74 hectares at Plot No. IT-5, as notified by the Government of India and delineated in the annexed map — and lays down what happens if the SEZ area later changes: GEPL must approach the Commission within 15 days of any notification or de-notification, and must keep supplying consumers in a de-notified area until alternative supply is arranged (p2).
Paragraphs 5–9 set the licence term (25 years running from the SEZ notification date of 11 June 2013), require public inspection of the licence, require 24-hour uninterrupted supply in the area, and reserve the Commission's powers to amend the regulations and to remove difficulties by order (p2). Schedule 1 is a map of the area of supply (p3).
Read with this
Amendments and corrections
Commencement notices and reasons
- Dated 7 Mar 2017Gigaplex Estate SEZ Distribution Licence Regulations, 2015 — First Amendment, 2017 — Statement of Reasons
- Dated 20 Sep 2018Gigaplex Estate Specific Conditions of Distribution Licence (Second Amendment) Regulations, 2018 — Statement of Reasons
- Dated 12 Jun 2023Gigaplex Estate Specific Conditions of Distribution Licence, 2015 — Third Amendment, 2023 — Statement of Reasons
Other copies of these documents (1)
7 more documents belong here and are not on Voltaic: 4 copies in another language and 3 drafts or notices on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.