OERC · Odisha Electricity Regulatory Commission
Wheeling Tariff and Retail Supply Tariff Regulations, 2022
Wheeling Tariff and Retail Supply Tariff Regulations, 2022 (Gazette)
RegulationDate not stated
Summary
Summary written by software, from pages 1 to 33 of 69. Check the regulator's original before you rely on it.
The portion is the principal OERC regulation for determining distribution licensee revenue requirements and tariffs in Odisha over a multi-year control period. It extends to the whole State and applies to all existing and future distribution licensees, including GRIDCO, and is guided by Sections 61–65 of the Electricity Act, 2003 (p2). It supersedes the 2014 wheeling and retail supply tariff regulations (p2), though the 2014 framework continues for certain assets until these Regulations apply (p33).
Chapters 1–2 establish the framework. Chapter 1 gives definitions, including Control Period as FY 2023-24 to FY 2027-28, Effective Date as the vesting dates of the four discoms, and useful-life categories; it sets scope for separate ARR and tariff determination for Wheeling Business and Retail Supply Business, with open-access surcharges to follow the 2020 Intra-state Open Access Regulations (pp2–12). Chapter 2 requires a Long-Term Business Plan for the whole control period, annual ARR, APR and truing-up filings, and specifies the form and timelines; it also provides for segregation of wheeling and retail supply accounts and an interim allocation matrix (pp13–17, p16). It sets out tariff order issuance and adherence, annual tariff determination, truing up, treatment of controllable and uncontrollable costs, sharing of gains/losses, regulatory assets, and the subsidy mechanism (pp18–25).
Chapter 3 begins the financial principles: right to use land, capital investment planning and DPR requirements, capital cost prudence, treatment of consumer contributions, grants and deposit works, debt-equity ratio for existing and new projects, return on equity, and the start of interest and finance charges on loan capital (pp26–33). The pages stop at the start of the interest-on-loan provisions.
Read with this
Commencement notices and reasons
- Date not statedWheeling and Retail Supply Tariff Regulations, 2022 — Need for Notification
- Date not statedGeneration Tariff Regulations, 2020-24
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of OERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.