WBERC · West Bengal Electricity Regulatory Commission
Revised Tariff Policy, 2016
TARIFF POLICY
PolicyDated 28 Jan 2016Published in the Gazette 28 Jan 2016No. 23/2/2005-R&R (Vol-IX) dated 28th January, 2016
Summary
Summary written by software, from pages 1 to 26 of 27. Check the regulator's original before you rely on it.
The Ministry of Power's 28 January 2016 resolution notifies a revised Tariff Policy under s.3(3) of the Electricity Act 2003. It replaces the policy framework of the 6 January 2006 Tariff Policy and its later amendments, takes effect from Gazette publication, and saves prior actions if consistent with the revised policy (p1). Sections 1–4 explain the statutory basis, the role of CERC/SERCs and the Forum of Regulators, the consultation process, and policy objectives covering reasonable tariffs, financial viability, competition, renewables, hydro and reliable supply (p1–3).
Section 5 lays down the general tariff approach: competitive procurement as the default, exceptions for expansion and State-promoted generation, conditional cost-plus options for hydro and pumped storage projects, and the common performance-based cost-of-service framework for generation, transmission and distribution. That framework addresses return on investment, equity norms, depreciation, cost of debt, foreign-exchange risk, operating norms, renovation and modernisation, multi-year tariffs, CDM benefits, composite schemes, State duties and open access (p3–10).
Section 6 covers generation: bidding, coal-supply shortfall pass-through, two-part tariffs, sale of un-requisitioned power, payment security, change in law, coal washeries, use of treated sewage water, captive generation, renewable purchase obligations, solar and waste-to-energy procurement, RECs, renewable bidding and thermal-renewable bundling (p11–15). Section 7 covers transmission pricing, loss allocation, CTU/STU performance incentives, information sharing, emergency allocation priority and ancillary services (p15–17).
Section 8 covers distribution: service standards, load forecasting, micro-grid purchase, MYT implementation, revenue requirements and costs, subsidy compliance, regulatory assets, tariff design and cross-subsidy roadmap, smart metering, connection charges, and cross-subsidy/additional surcharge for open access (p17–26). Section 9 addresses trading margin (p26). The Appendix begins the R&R features for hydro project affected families (p26.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read WBERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document WBERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of WBERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.