KERC · Karnataka Electricity Regulatory Commission
Generation Tariff Regulations, 2009 — Chapter 5: Scheduling, Accounting and Billing
SCHEDULING, ACCOUNTING AND BILLING
RegulationDate not stated
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is Chapter 5 of a KERC regulation — Scheduling, Accounting and Billing — reproduced as a short excerpt (pp1–2). Clause 30 sends scheduling and dispatch methodology for generating stations to the KERC Grid Code 2005 / Indian Electricity Grid Code as amended from time to time, and clause 31 does the same for metering and accounting (p1). Clause 32 requires the generating company to raise monthly bills for capacity and energy charges, paid directly by beneficiaries, and fixes how those charges are shared: thermal capacity charge by each beneficiary's percentage share in installed capacity, while hydro beneficiaries share both capacity and energy charges in proportion to their shares (p1). Note 1 states that beneficiary allocations in a station's total capacity are determined by the State Government, expressed as percentages of installed capacity and normally constant within a month (p1). Clause 34 gives rebates for prompt payment, distinguishing payment by letter of credit on presentation from other payment within a month of presentation (p2). Clause 35 allows the generating company to levy a monthly late payment surcharge where a beneficiary delays beyond 60 days from the date of billing (p2).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.