Judgment – W.P. No. 8510/2012 (TANGEDCO), Madras High Court, 14/09/2012

Judgment – Writ Petition No. 8510/2012 (TANGEDCO), Madras High Court, dated 14/09/2012

JudgmentDated 14 Sep 2012

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 23 of 31. Check the regulator's original before you rely on it.

This is the Madras High Court's common judgment on W.P.Nos.8509 and 8510 of 2012 and connected stay petitions, filed by Tamilnadu Generation and Distribution Corporation Ltd (TANGEDCO) against CERC, NLDC, SRLDC, Power Grid Corporation and the Ministry of Power (p1–2). TANGEDCO asks the court to declare two CERC notifications dated 6.2.2012 arbitrary, unreasonable and ultra vires: the First Amendment to the Indian Electricity Grid Code Regulations, 2010 and the Second Amendment to the Unscheduled Interchange Charges and Related Matters Regulations, 2009 (p2–3, p7–8). The amendments narrow the operating grid-frequency band and revise UI charges; the change was to take effect from 2.4.2012 (p3, p8).

Pages 2–13 set out the petitioner's case: CERC ignored mandatory factors and the southern grid's asynchronous HVDC links with the NEW grid; corridor congestion prevents it from buying power from other regions; narrowing the band will increase UI charges, power costs and load shedding in Tamil Nadu, and will hurt consumers (p3–13). Pages 13–23 set out the respondents' defence: CERC acted under the Electricity Act, 2003 and after public consultation; the amendments are needed for grid safety, security and discipline; they do not offend Article 14 or the doctrine of proportionality; and the petitioner should contract long/medium term rather than rely on UI overdrawal (p13–23). The extract also records Supreme Court case law on subordinate legislation and proportionality (p14–23). The pages do not contain the final operative order; they are the pleadings, arguments and precedents. The document matters for challenges to CERC's grid-code and UI amendments and for the Southern Grid integration debate.

Standard name
Grid Code, DSM Regulations
Primary topics
Grid operation and grid code, Deviation settlement (DSM), Congestion and curtailment

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document