TNERC · Tamil Nadu Electricity Regulatory Commission
Amendment
RegulationDated 16 Dec 2011
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a single-clause amendment by the Tamil Nadu Electricity Regulatory Commission to the Tamil Nadu Electricity Supply Code, issued as Notification No. TNERC/SC/ 7-29 dated 16-12-2011 and published in the Tamil Nadu Government Gazette (p1–2). It responds to a revenue problem reported by TANGEDCO: where a consumer is a leaseholder who cannot produce the owner's consent letter in Form 5 of Annexure III to the Distribution Code, and the owner disclaims responsibility for the bill, arrears and miscellaneous charges go unrecovered, and the existing practice of taking two or three times the monthly average of the preceding twelve months' charges as Additional Security Deposit is stated to be insufficient (p2).
The operative change inserts sub-clause (vii) into Clause (5) of Regulation 5 of the Principal Code (p3). It distinguishes non-owner consumers by billing cycle: for monthly billing the security deposit is set at a multiple of the monthly average of electricity charges for the twelve months prior to April, and for bi-monthly billing at a higher multiple of the same base (p3–4). The amendment states that it was subjected to previous publication before insertion (p3).
Sub-clause (c) limits the new multiples' reach: they apply to existing service connections when the security deposit is reviewed, while new connections to non-owner applicants go through the Commission's Orders on Non-Tariff related Miscellaneous Charges and regulation 27(4) of the Tamil Nadu Electricity Distribution Code, with the new consumers later reviewed for adequacy under (a) or (b) (p4). The Code comes into force on the date of publication in the Gazette and is signed by the Commission's Secretary (p3–4).
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.