CSERC · Chhattisgarh State Electricity Regulatory Commission
Renewable Energy Generation Tariff Regulations, 2019
Chhattisgarh State Electricity Regulatory Commission (Terms and conditions for determination of generation tariff and related matters for electicity generated by plants based renewable energy sources) Regulations, 2019
RegulationDated 24 Dec 2019No. 83/CSERC/2019 dated 24thDecember 20 I 9
Replaced by Renewable Energy Generation Tariff Regulations, 2022
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CSERC's principal tariff regulation for renewable energy generation in Chhattisgarh, notified at Raipur on 24 December 2019 but brought into force retrospectively from 1 April 2019 for a three-year control period (p2, p7). It applies to renewable energy generating stations in Chhattisgarh selling their entire output to distribution licensees on a long-term basis, principally new projects achieving COD between 1 April 2019 and 31 March 2022, and also sets eligibility by technology — wind, small/mini/micro hydro and large hydro above 25 MW, biomass on Rankine cycle, non-fossil fuel cogeneration, solar PV/thermal/rooftop/small solar, MSW and RDF (pp6–7). Existing biomass and other RE projects with long-term PPAs are carved out for fixed charges, which remain governed by earlier Commission orders, while energy charges are determined under these regulations (p6).
After definitions and interpretation (pp3–6), Chapter 1 lays down general principles: the control period, tariff period tied to useful life, generic preferential tariff, project-specific tariff, petition requirements, tariff structure and design, and must-run/dispatch treatment of RE plants (pp7–10). Chapter 2 sets the financial principles: capital cost, debt-equity, loan and finance charges, depreciation, return on equity, working capital interest, O&M, rebate, late payment surcharge, ceiling norms, subsidy treatment, pass-through of cess/duties/water charges, and CDM benefit sharing (pp10–14).
Chapters 3 to 9 provide technology-specific parameters — wind (pp14–15), small hydro (pp15–16), biomass Rankine (pp16–19), non-fossil cogeneration (pp19–20), solar PV (pp20–21), solar thermal including hybrid (pp21–22), and MSW/RDF (pp21–23). These specify capital cost, CUF/PLF, auxiliary consumption, heat rate, O&M and fuel-related norms, and include fuel-mix monitoring by CREDA for biomass and MSW/RDF. Chapter 10 covers deviation from norms, power to relax, removal of difficulties, and repeal with savings of the 2016 waste-to-energy regulations (p24). Forms and schedules for parameter assumptions and fuel reporting follow (pp25–30).
Read with this
Amendments and corrections
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.