JSERC · Jharkhand State Electricity Regulatory Commission
Transmission Tariff Regulations, 2025
Draft Jharkhand State Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2025
Draft regulationDated 15 Oct 2025Published in the Gazette 15 Oct 2025Notification No. 114 dated 15th October, 2025
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software, from pages 1 to 36 of 53. Check the regulator's original before you rely on it.
This is notification No. 114, published in the Jharkhand Gazette Extraordinary dated 15 October 2025, by which JSERC makes its 2025 transmission tariff regulations (p1). The regulations set a multi-year framework for intra-state transmission in Jharkhand for the control period from 1 April 2026 to 31 March 2031, after Gazette publication, and say they supersede the 2020, 2015, 2010 and 2007 transmission tariff regulations, while preserving those earlier regulations for ARR/tariff and review matters up to 31 March 2026 (p2–3).
Chapter I (pp2–11) fixes short title, commencement, extent, scope and definitions. They apply to all Transmission Licensees in Jharkhand and to cost/ARR-based tariff; tariffs discovered through s.63 competitive bidding adopted by the Commission are excluded (p3). Norms are ceiling norms, and licensees and beneficiaries may agree improved norms (p11).
Chapter II (pp12–19) sets the MYT framework: filing of MYT applications, business plan, capital investment plan, forecasts, performance trajectories, annual review, and sharing of gains/losses. It classifies controllable and uncontrollable parameters, provides for pass-through of uncontrollable variations subject to prudence check, and sets an incentive/penalty framework. It also specifies truing up and annual performance review procedures, including recovery/refund of over- or under-recovery (pp16–19).
Chapter III deals with ARR determination. It lists the ARR components (p20), governs capital cost admission, additional capitalisation, R&M (pp20–27), prescribes O&M expense formula and indexation (pp27–29), debt-equity treatment (pp29–30), return on equity, interest on loan and working capital, depreciation, income tax, non-tariff income and other-business income (pp30–35). It also sets quality-of-supply parameters, normative transmission availability, annual transmission charges and monthly recovery formulas based on availability bands (pp35–36).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.