Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Terms and Conditions of Service of Staff (Second Amendment) Regulations, 2020

Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions of Service of Staff) (Second Amendment) Regulations, 2020

AmendmentDated 27 Jun 2020No. HPERC-B(3)-1/2011-705-Vol-VI dated Shimla, the 27th June, 2020

Amends the Terms and Conditions of Service of Staff Regulations, 2013.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short notification (p1) by the Himachal Pradesh Electricity Regulatory Commission, dated 27 June 2020, making the second amendment to its 2013 regulations on the terms and conditions of service of the Commission's own staff. Clause 1 gives the short title and says the amendment takes effect from publication in the Rajpatra, Himachal Pradesh; the Gazette date itself is not printed (p1).

Clause 2 carries the only substantive change: a new item at serial number 11 is inserted into Part-II of Schedule-II of the 2013 Regulations, creating the post of Director (Technical Analysis) and specifying that it is filled by promotion from Joint Directors or Deputy Directors appointed on a regular basis in the Commission, subject to an engineering degree or equivalent and a stated length of experience in electricity supply, transmission/distribution or power-sector regulatory affairs, part of it as regular service on Deputy Director and above posts (p1). It governs internal Commission staffing only and imposes nothing on licensees, generators or consumers.

Standard name
Commission Staff Regulations
Primary topics
Commission staff and members

Read with this

The regulation

Proposed changes (drafts with no final yet)

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document