Procurement of Electricity from Rooftop PV & Small Solar Power Generation Programme (RPSSGP) Category 1 Projects Regulations, 2010
Assam Electricity Regulatory Commission (Procurement of Electricity from Projects / Schemes covered under 'Rooftop PV & Small Solar Power Generation Programme' (RPSSGP) - Category 1 Projects under Jawaharlal Nehru National Solar Mission) Regulations, 2010
RegulationDated 31 Oct 2010No. AERC.22/2010/ dated The 31st October, 2010
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Assam Electricity Regulatory Commission's notification of 31 October 2010 (No. AERC.22/2010) makes a regulation with a deliberately narrow purpose: to satisfy the MNRE condition that a State have its own tariff framework in place before projects from that State can join the Rooftop PV & Small Solar Power Generation Programme (RPSSGP) under the Jawaharlal Nehru National Solar Mission (p1, p3).
Regulation 2 sets out the JNNSM as background, reproducing the Mission's capacity, off-grid, solar-thermal and rural-lighting targets (p1–2). Regulation 3 defines the scope: it distinguishes Category 1 projects (connected at HT below 33 kV) from Category 2 LT projects, notes that MNRE's guidelines cover only Category 1, and reproduces the key features of RPSSGP — the MoU chain among generator, distribution licensee and IREDA as Programme Administrator, the levelised tariff tenure, monthly certificates of power purchased, and the generation-based incentive flow from IREDA to the distribution licensee (p2–3). It states expressly that the regulations exist only to fulfil the MNRE requirement, and that other solar and renewable projects continue under AERC's 2009 Cogeneration and Renewable Sources regulations (p3).
Regulation 4 is the operative part: it fixes a control/review period, a tariff period running from commercial operation, an annual review of benchmark capital cost, a conditional carry-forward of the generic tariff into the following year, and, for RPSSGP projects, adopts the CERC-determined levelised tariff (including CERC's annual tariffs) as the applicable Assam tariff, with a base rate that escalates annually for later projects but stays constant for a given project (p3–4). Regulation 5 requires compliance with the MNRE guidelines' procedural formalities and technical requirements (p4).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of AERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.