Consumer Grievance Redressal Forum (Removal of Difficulty) First Order, 2025

UPERC (Consumer Grievance Redressal Forum) (Removal of Difficulty) first order, 2025

OrderDated 7 Apr 2025

Made under the Consumer Grievance Redressal Forum Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on uperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short UPERC order of 7 April 2025 that uses the Commission's 'power to remove difficulties' under its Consumer Grievance Redressal Forum (CGRF) Regulations, 2022 to resolve one practical conflict between two sets of regulations (p1, p3).

Regulation 3.11(e) of the CGRF Regulations, 2022 requires every complaint to the CGRF to be accompanied by a fee, set by a consumer-category table reproduced in the recitals. The UPERC (Standard of Performance) Regulations, 2019 — under which a consumer claims compensation from the licensee for service failure — prescribe no fee of their own. Consumers objected to CGRFs demanding a fee before registering compensation grievances, and the Electricity Ombudsman wrote to the Commission on 06.12.2024 asking for a clarification (p1–2).

The order recites that fee table, the SoP provision on compensation claims (claim to the licensee, then CGRF within 60 days of the claim, interest to be determined by CGRF/Ombudsman), and the Commission's powers under Regulation 6.1 (to issue directions to the forums) and Regulation 9 (removal of difficulties) (p1–3).

The operative part gives the order its short title and commencement from the date of issue, and adds a proviso below Regulation 3.11(e): no fee is payable by a consumer of any category, whatever the contracted load, when approaching the CGRF for redressal in compensation matters under the SoP Regulations, 2019 and its amendments. All other provisions of the Regulations are expressly left unchanged (p3). It is signed by the Member and the Chairman at Lucknow (p3).

Standard name
CGRF and Ombudsman
Primary topics
Consumer grievance redressal (CGRF), Fees payable to the Commission, Standards of performance

Read with this

The regulation

Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on uperc.org ↗

Report an issue with this document