Skip to content

HERC · Haryana Electricity Regulatory Commission

Fee Regulations, 2005 — 7th Amendment Regulations, 2022

Haryana Electricity Regulatory Commission (Fee) Regulations, 2005, 7th Amendment Regulations, 2022

AmendmentDated 9 Nov 2022HERC/10/2005/7 th Amendment/2022 dated 9th November, 2022

Amends the Fee Regulations, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Haryana Electricity Regulatory Commission notification dated 9 November 2022 (p1) making the seventh amendment to the HERC (Fee) Regulations, 2005. It runs to three operative regulations followed by a complete new Schedule of Fee.

Regulation 1 gives the short title, ties commencement to publication in the Haryana Government Gazette, and extends the regulations to the whole of Haryana (p1). Regulation 2 rewrites regulation 3(3) of the principal regulation: fees are non-refundable and payable by bank draft, RTGS/NEFT/IMPS or banker's cheque in favour of the Secretary, HERC at Panchkula, with the petitioner required to send the Commission the computational detail when paying electronically (p1). Regulation 3 replaces the existing Schedule of Fee — expressly the schedule appended to the amendment notified on 31 August 2022 (p1) — so this is a fast second bite at the fee table.

The new Schedule (pp1–9) has 21 numbered heads: application processing fee for grant of licence under s.14 (left to the Haryana Government's 2005 Processing of Fees Rules); annual fees for transmission, distribution, intra-state and inter-state trading, competitive-bid and deemed licensees, all framed as a share of ARR, annual revenue or traded value with minimum floors (pp1–3); flat petition fees for deemed licensee status, business plan and capital investment plan approval, additional surcharge/FSA determination, prior approval under s.17, licence amendment under s.18, s.36 rate determination, open-access dispute adjudication and s.86(1)(f)/s.35 disputes (pp3–4, p7); tariff determination under s.62 and tariff adoption under s.63, graded by technology class and capacity band with per-MW components (pp4–6); PPA/PSA/TSA approval and power-source approval charged on contracted capacity, with a set-off rule so the same transaction is not paid for twice (pp6–7, p9 Note 4); review petition fees with a small-consumer carve-out, document inspection, certified copies, SLDC petitions and a residual head for anything not covered, including complaints under ss.142/146 (pp7–8); a delay surcharge and an escalating late-filing fee (pp8–9); and cost of public-notice advertisement borne by parties if so ordered (p9).

The closing Notes set how renewable/non-conventional projects are classified, where removal-of-difficulty petitions are charged, the rounding convention, and the source-approval/PPA fee adjustment (p9).

Standard name
Fees and Fines Regulations
Primary topics
Fees payable to the Commission

Read with this

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on herc.org.in ↗

Report an issue with this document