TNERC · Tamil Nadu Electricity Regulatory Commission

Fees and Fines (Amendment) Regulations, 2011

Tamil Nadu Electricity Regulatory Commission Fees and Fines (Amendment) Regulations, 2011

AmendmentDated 4 Feb 2011Published in the Gazette 16 Feb 2011TNERC/F & F/4/2-6 dated 04-02-2011

Replaced by Fees and Fines Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Fees and Fines Regulations, 2004.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Tamil Nadu Electricity Regulatory Commission's Fees and Fines (Amendment) Regulations, 2011, published in the Tamil Nadu Government Gazette of 16 February 2011 (p1). It uses the Commission's power under s.86(1)(g) of the Electricity Act, 2003 to substitute fee entries in two regulations of the TNERC Fees and Fines Regulations, 2004 — the 'Principal Regulations', notified in the Gazette of 18 February 2004 (p2).

Clause 2 rewrites the fee table in Regulation 6. It replaces the entry for tariff determination applications with a fee based on the applicant's revenue receipts, distinguishing an existing licensee from a new licensee and capping the amount; replaces the three general miscellaneous-application entries for individuals, companies and other corporate bodies; adds a separate fee for interlocutory applications in a pending petition; restructures the miscellaneous-petition entry into sub-items for registered associations of consumers or generators and for other registered associations; and re-sets the fee for adjudication of licensee–generating company disputes under s.86(1)(f) as a share of the amount in dispute subject to a minimum (p2–3).

Clause 3 substitutes two annual licence fee entries in Regulation 9: transmission, charged per MW of capacity available at the end of the previous year with a floor, and distribution, charged per unit of electricity proposed to be sold with both a floor and a ceiling (p3).

Clause 1 gives the short title and states that the amendment comes into force on publication in the Gazette (p2). The notification is dated 4 February 2011 and signed on 8 February 2011. No transitional, savings or sunset provision appears in the text.

Standard name
Fees and Fines Regulations
Primary topics
Fees payable to the Commission

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (1)

Proposed changes (drafts with no final yet)

10 more documents belong here and are not on Voltaic: 8 copies in another language, 1 draft or notice on a draft and 1 draft or notice on a draft not held as English text.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document