Skip to content

MPERC · Madhya Pradesh Electricity Regulatory Commission

Smart Prepaid Billing Practice Directions, Madhya Pradesh, 2023

Practice Directions for Smart Prepaid Billing of consumers of Madhya Pradesh, 2023

OrderDated 5 Dec 2023Petition No. 34 0f 2023 dated 05.12.2023

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on mperc.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is MPERC’s order dated 05.12.2023 in Petition No. 34 of 2023, by which the Commission issues Practice Directions for smart prepaid billing in Madhya Pradesh. The order page records the procedural history: petition by MP Power Management Company and the three Discoms, admission on 01.08.2023, publication of a draft on 14.09.2023, stakeholder comments by 03.10.2023, and a public hearing on 10.10.2023 (p1). The operative instrument is attached and begins at p2.

Chapter I gives the short title and says the directions extend to the whole of Madhya Pradesh and commence from Commission approval (p2). Chapter II defines the core terms — AMI, Approved ABR, automatic cut-off, ESD, final monthly bill, grace period, minimum recharge, prepaid consumer, smart prepaid account, prepayment meter — and makes the directions applicable to new and existing consumers where prepayment smart meters are installed, subject to feasibility; rollout is phased by area/feeder/consumer class within RDSS timelines and with Commission approval (pp2–5). It also disapplies the section 56(1) notice for automatic prepayment cut-off while preserving section 56 for recovery and disconnection (p5).

Chapter III deals with metering: migration from postpaid to prepaid, treatment of old meters, advance intimation, meter security deposit, installation and replacement obligations, IS/CEA conformity, AMI-compatible two-way meters, consumer purchase option, spare stock, and the requirement for Commission-approved SOP and FAQs (pp5–7).

Chapter IV governs money and billing: rebates on recharge/payment, withdrawal or carry-forward of energy security deposit on migration, adjustment of arrears, instalment and disputed-arrear treatment, daily provisional billing, month-end final billing, reconciliation, due date and final-bill access, and billing when the meter is dysfunctional (pp7–11). It then covers recharge methods (p11), the disconnection process with grace period, alerts, no night-time auto cut-off, restoration and permanent disconnection (pp11–14), recordkeeping and revenue recognition (p14), and non-applicability of certain advance/prompt-payment rebates to migrated prepaid consumers (p14).

Primary topics
Billing and payment, Metering, Conditions of supply

Voltaic last read MPERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (4 pages). A document MPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on mperc.in ↗

Report an issue with this document