KERC · Karnataka Electricity Regulatory Commission
Connectivity and General Network Access to Intra-State Transmission and State Distribution System Regulations, 2026 — Draft
Karnataka Electricity Regulatory Commission (Connectivity and General Network Access to the Intra-State Transmission and State Distribution System) Regulations, 2026
Draft regulationDated 4 Jun 2026Published in the Gazette 11 Jun 2026KERC/F-32/V-27/2083 dated 04.06.2026
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Karnataka Electricity Regulatory Commission issued this draft on 4 June 2026 (Notification No. KERC/F-32/V-27/2083) and published it in the official gazette of 11 June 2026, inviting objections/suggestions within 30 days; the regulations are to come into force on 1 October 2026 (p1–2). It consolidates connectivity and general network access (GNA) to the intra-state transmission system and the state distribution system into one framework, following the Forum of Regulators' model regulations, and repeals the KERC (Terms and Conditions for Open Access) Regulations, 2025 (p1, p52).
Chapter 1 (pp2–6) defines the vocabulary for the whole framework — connectivity, GNA, connectivity grantee, lead generator and lead ESS, associated transmission system, solar-hour and non-solar-hour access, SOAR, stranded transmission capacity and related terms. Chapter 2 (p7) covers the general application process, fees, deficiency handling and withdrawal of applications. Chapter 3 (pp8–29) is the connectivity code: who may apply at transmission level (5 MW and above) and at distribution level (below 5 MW), with captive plants exempt from a minimum size and a 100 kW floor for aggregated capacity; how applications are filed, how interconnection studies and the associated transmission system are determined, in-principle and final grant, the three-part connectivity bank guarantee, connectivity agreements, change of renewable source, dedicated transmission and distribution lines, infirm power and start-up power, interface meters, transfer of connectivity, and return or forfeiture of guarantees.
Chapter 4 (pp30–33) is the GNA code: eligibility, deemed GNA against existing long/medium-term contracts, applications for additional GNA, system study and grant timelines, and the effective date of GNA. Chapter 5 (pp34–36) deals with relinquishment and revocation of connectivity and GNA and the consequences for bank guarantees and billing. Chapter 6 (pp37–42) creates temporary GNA, the State Open Access Registry, application categories and processing timelines, grant, and standing clearance. Chapter 7 (pp43–44) governs allocation of transmission corridor among GNA and T-GNA grantees. Chapter 8 (pp44–49) sets commercial matters — scheduling and metering, curtailment priority, the components of GNA charges, imbalance and reactive energy charges, banking of renewable energy, standby charges, losses, other fees, residual and infirm energy, late payment, default and payment security. Chapter 9 (pp50–52) provides for green certificates, the detailed procedures and formats to be issued by the Nodal Agency and SLDC, difficulty-removal powers, the dispute route, amendment power, and repeal and savings.
Page 53 begins a separate draft notification (KERC/KEDC/2026-27/2080, dated 4 June 2026) proposing the first amendment to the Karnataka Electricity Distribution Code, 2025 on vendor approvals.
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.