Skip to content

PSERC · Punjab State Electricity Regulatory Commission

Power Quality Regulations, 2023

PSERC Power Quality Regulations, 2023

RegulationDated 21 Mar 2023Published in the Gazette 21 Mar 2023

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on pserc.punjab.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Punjab State Electricity Regulatory Commission's principal power quality regulation, notified on 21 March 2023 and made under s.181 read with ss.61, 57 and 59 of the Electricity Act 2003 (p1). It comes into force on Gazette publication, but the compensation payable by the distribution licensee for breaching the Table 15 standards is deferred to a date the Commission will notify separately (p1).

Chapter 1 (pp1–7) contains the short title, extent to Punjab and commencement, plus an unusually long definitional set — 56 definitions covering voltage bands (LV/MV/HV), declared and nominal voltage, PCC, flicker, harmonics, THD/TDD, dips and swells, interruptions, SAIDI/SAIFI, normal operating conditions, and defined consumer categories such as 'Designated Consumers' (11 kV and above, with a list of enumerated process industries plus IT/ITES, malls, railway traction and full open access consumers).

Chapter 2 (pp8–10) sets objectives, the measurement basis (IS standards, falling back on IEC 61000-4-30:2015), scope, roles of the distribution licensee and designated consumers, and a complaint-redressal procedure with escalating time limits — 5 working days for local faults, 15 working days where no network expansion is needed, 180 days where upgradation is required — with escalation to the Appropriate Forum under the Forum & Ombudsman Regulations 2016.

Chapter 3 (pp11–22) is the operative standards chapter: voltage variation limits by voltage band and by whether the network is interconnected with the transmission system; flicker severity; voltage unbalance; voltage dip and swell event allowances; harmonic limits (voltage THD by PCC bus voltage, current TDD by Isc/IL ratio and voltage band, importing IEEE 519-2014); the PQ meter installation obligations and penalties for designated consumers; compensation scales for TDD exceedance; and reliability indices SAIDI/SAIFI with urban and rural limits, plus the exclusions from their calculation.

Chapter 4 (pp23–24) covers monitoring and reporting — phased PQ meter rollout (20% of identified 11/33/66 kV feeder locations in phase one), continuous metering, quarterly compliance reporting, self-audit and 5% independent audit, website disclosure, and data security. Chapter 5 (pp25–26) sets the compensation mechanism, including Table 15 which prices each distribution-licensee failure type and provides that such compensation cannot be claimed in ARR. Chapter 6 (p27) is the boilerplate: power to relax, remove difficulties, and issue orders and practice directions.

Standard name
Power Quality

Read with this

Procedures and orders made under it

Voltaic last read PSERC's website for final documents on 26 Nov 2026. A document PSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of PSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on pserc.punjab.gov.in ↗

Report an issue with this document