NERC · Nagaland Electricity Regulatory Commission
State Grid Code Regulations, 2012
Nagaland Electricity Regulatory Commission (State Grid Code) Regulations, 2012
CodeDated 9 May 2012No.NERC/REGN/2012(B) dated 9th May, 2012
Summary
Summary written by software, from pages 1 to 53 of 131. Check the regulator's original before you rely on it.
The Nagaland Electricity Regulatory Commission (State Grid Code) Regulations, 2012, notified by NERC at Kohima on 9 May 2012, create a state-level grid code for the whole of Nagaland (p2). They apply to all intra-State transmission system participants: the STU and transmission licensees, generating stations connected to the intra-State transmission system, distribution licensees, EHV consumers directly connected, open-access customers and captive generators (p2–3). Chapter 1 sets title, extent, commencement, scope and an extensive definitions table (p2–13). Chapter 2 assigns functions to the State Transmission Utility and State Load Despatch Centre, states the code’s objectives, applicability, implementation, non-compliance consequences, confidentiality and directive powers, and says the IEGC prevails for inter-State inconsistency (p14–20). Chapter 3 creates the Grid Code Review Committee and Protection Coordination Committee and sets review and amendment procedures (p20–23). Chapter 4 covers transmission system planning — policy, criteria, data, annual reporting and implementation (p24–29). Chapter 5 specifies connection conditions and the application-to-agreement process, site responsibility, connection points and renewable-energy connectivity (p30–36). Chapters 6–8 address system security, protection requirements and fault clearance, and frequency and voltage management (p37–47). Chapter 9 covers operation planning, demand estimation, demand control, load crash, reporting and operating policy (p47–52); Chapter 10 begins monitoring of generation and drawal (p53). The contents fragment also lists later chapters on outage planning and scheduling and despatch (p1).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read NERC's website for final documents on 1 Oct 2026. A document NERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of NERC's website on 1 Oct 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.