KERC · Karnataka Electricity Regulatory Commission
Verification of Captive Status of Generating Plant/Consumers in Karnataka Regulations, 2023 — Draft
Karnataka Electricity Regulatory Commission (Verification of captive status of generating plant/consumers in the State of Karnataka) Regulations, 2023.
Draft regulationDated 27 Sep 2023KERC/GC/CT-2/18-19/Vol-II dated 27-09-2023
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Commission issues a draft of the KERC (Verification of captive status of generating plant/consumers in the State of Karnataka) Regulations, 2023, dated 27-09-2023 (p1). The preamble sets out the statutory basis — s.2(8) and s.9 of the Electricity Act, Rule 3 of the Electricity Rules, 2005 and s.42(2) — and relies on an ATE order to assert State Commission jurisdiction over captive status; it cites the Forum of Regulators' model regulations and notes confusion when consumers join or leave the grid mid-year (p1–2). The draft is published under s.181(3) for objections, to be taken up after 30 days from Gazette publication (p2).
Regulations 1–2 deal with short title, commencement and application to all generating plants and consumers claiming captive status in Karnataka, and define key terms (p2–4). Regulation 3 provides for annual monitoring of captive status after the financial year, based on shareholding as on 31 March and consumption data, with special rules for new plants and multi-state verification by the Central Electricity Authority (p5). Regulation 4 sets out verification of ownership and consumption criteria for five categories of captive users, documentation requirements, annual verification by distribution licensees, and net-generation/proportionality calculations (p6–10). Regulation 5 specifies metering, data reporting and a web portal for energy allocation (p10–11). Regulations 6–8 cover default, financial consequences including a bank guarantee for surcharge, and dispute resolution (p11–12). Regulations 9–11 provide powers to remove difficulties, amend, and interpret (p12). Annexure-I gives formats for group captive status and monthly energy data (p13–16).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.