Assam Distribution Code Regulations, 2004

Assam Electricity Regulatory Commission (Distribution Code) Regulations, 2004

RegulationDated 6 Aug 2004Published in the Gazette 5 Feb 2005No. AERC. /2004/8 dated The 6th August, 2004

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software, from pages 1 to 32 of 58. Check the regulator's original before you rely on it.

Notification p1 frames the Assam Electricity Regulatory Commission (Distribution Code) Regulations, 2004 under Electricity Act 2003 s.181 read with s.42(1). It applies to all Distribution System participants — Distribution Licensees, Open Access Customers, other Distribution Licensees, Embedded Generators and Large Consumers — and extends to Assam, commencing from gazette notification (p1).

Chapter 1 sets general objectives, allows suspension during security or emergency periods or by Commission direction, gives overriding effect to electricity laws, the IEGC, the State Grid Code and Commission directions, and covers data submission, notices, confidentiality, dispute settlement and non-compliance (p2–3).

Chapter 2 is a definitions and abbreviations chapter for technical, commercial and institutional terms used across the code (p4–13). Chapter 3 establishes the Distribution Coordination Committee, its membership, subcommittees, code revision process, dispute resolution panel and reporting arrangements (p14–18).

Chapter 4 sets distribution planning requirements: five-year planning procedures, database management, load data research, long-term demand estimation, opportunity statements, technical and design criteria, voltage regulation and energy audit (p19–25).

Chapter 5 sets connection requirements: application procedure, site responsibility schedules, connection agreements, connection points for transmission/generators/HT/LV consumers, connected equipment and plant restrictions, and interface with small generating units including CPPs (p26–32).

Standard name
Distribution Code
Primary topics
Distribution system planning and operation, New connections and load changes, Technical standards

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of AERC's website on 30 Sep 2026, Voltaic holds no later regulation that replaces this one.