MERC · Maharashtra Electricity Regulatory Commission
Specific Conditions of Distribution Licence (Serene Properties) Regulations, 2013
Maharashtra Electricity Regulatory Commission [Specific conditions of Distribution Licence applicable to M/s. Serene Properties Private Limited (SPPL) for the IT/ITES SEZ at Airoli, Thane] Regulations, 2013
RegulationDated 21 Aug 2013No. MERC/TEC/ Licence Conditions/ SPPL/2013/01089 dated 21st August 2013
1 amendment to it is on Voltaic, dated 4 Aug 2016.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a MERC notification of 21 August 2013 that fixes the licence conditions specific to a single deemed distribution licensee — Serene Properties Private Limited (SPPL) — for the IT/ITES SEZ at Airoli, Thane (p1–2). It is made under s.181(2)(d) read with s.16 and s.14(b) of the Electricity Act 2003, and it works as a companion to the Commission's General Conditions of Distribution Licence Regulations, 2006: regulation 3 says the two sets together are deemed to be SPPL's licence conditions and govern its distribution and retail supply (p2).
Regulation 1 gives the short title and confines the regulations to the area of the SEZ notification, with commencement on Gazette publication (p1). Regulation 2 defines the key terms — Act, Developer and Co-Developer (borrowed from the SEZ Act 2005), Deemed Distribution Licensee, General Conditions, SPPL, SEZ Act and SEZ Rules — and defaults undefined words to the Electricity Act and SEZ Act (p1–2).
Regulations 4 to 7 set the substance: the area of supply, delimited by the SEZ notification and drawn on the map at Schedule 1; a 25-year licence term running from the SEZ notification date; a duty to make the licence and these conditions available for public inspection; and a duty to provide round-the-clock uninterrupted supply within the area (p2–3). Regulations 8 and 9 reserve to the Commission the power to amend the regulations and to remove difficulties by order (p2). The document is short, licensee-specific and self-contained; its operative content is the licence's geographic, temporal and service obligations.
Read with this
Amendments and corrections
Commencement notices and reasons
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.