Skip to content

KERC · Karnataka Electricity Regulatory Commission

Smart Grid Regulations, 2015

Karnataka Electricity Regulatory Commission (Smart Grid) Regulations, 2015

RegulationDated 2 Feb 2016No. KERC/M/17/2015-16 dated 02-02-2016

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The KERC (Smart Grid) Regulations, 2015, notified as No. KERC/M/17/2015-16 dated 02-02-2016, create the framework under which Karnataka's transmission and distribution licensees must plan, obtain approval for, execute and report on smart grid programmes and projects (p1). They are made under s.181(2)(zp) of the Electricity Act, 2003, after a draft and a public hearing on 21-01-2016. They apply to all generating companies, transmission licensees, distribution licensees and consumers in the State connected to the State grid, and come into force on publication in the Gazette — the Gazette date is not printed (p1).

Chapter 1 carries the short title, extent and commencement and defines smart grid vocabulary — AMI, aggregator, microgrid, energy storage, interoperability, KPI, cyber security, WAMS (pp1–2). Chapter 2 states the objectives (integration of smart grid technologies, renewables and microgrids, network visibility, efficiency, consumer participation) and lets the Commission issue guidelines on programme formulation, cost-effectiveness assessment, monitoring, customer engagement, data protection, training and database design; issuing guidelines is expressly not a precondition for filing a plan (pp2–3).

Chapter 3 requires every transmission and distribution licensee to constitute a Smart Grid Cell within three months and assigns it baseline study, plan design, approval support and implementation duties (p3). Chapter 4 is the operative core: baseline studies and databases, an integrated multi-year Smart Grid Plan filed with the MYT/ARR petition, prior Commission approval for investments above Rupees 10 Crores, the contents of a project proposal and DPR, the Commission's powers to modify, incentivise and engage third parties or aggregators, a standards hierarchy running from CEA through KERC, BIS, IEC/IEEE/ANSI, and net incremental cost recovery through the ARR subject to prudence check (pp3–5).

Chapter 5 deals with completion reports within one month, their publication, and monitoring, evaluation and measurement and verification against approved KPIs (p5). Regulation 13 allows the Commission to amend, remove difficulties and issue directions, and the Schedule lists fourteen indicative smart grid component areas (p5).

Standard name
Smart Grid Regulations
Primary topics
Smart grid, Capital cost and investment, Technical standards

Read with this

No other documents to read with it are on Voltaic.

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document