Skip to content

CERC · Central Electricity Regulatory Commission

Tariff Filing Forms (Hydro) for Determination of Tariff, Part-II, Annexure-I

TARIFF FILING FORMS (HYDRO) FOR DETERMINATION OF TARIFF PART-II Annexure-I

RegulationDate not stated

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Part-II, Annexure-I set of blank tariff filing forms that a hydro generating company must complete when petitioning the Central Electricity Regulatory Commission for determination of its tariff. It is a filing instrument, not a statement of norms: NAPAF, RoE, depreciation and interest parameters are referred to but never quantified here — the filer supplies them.

Pages 2–4 are a checklist of every form and supporting document, from the summary sheet to audited accounts, loan agreements, BPSA/PPA copies, DPR, CPM/PERT charts and cost audit reports, with a note (p4) that an electronic copy of the petition in Word, calculations in Excel and other material must also be furnished on CD/floppy disc.

The forms run from p5. The summary sheet and Form 1(I)/1(II) (pp5–6) capture claimed capital cost and return on equity across columns running from FY 2013-14 ('existing') to 2018-19. Form 2 (pp7–8) records COD, station type (surface/underground, ROR/pondage/storage, peaking), design energy, auxiliary consumption and NAPAF, and points to Regulation 25 for the effective tax rate. Form 3 (pp9–10) is salient features of the hydroelectric project.

Forms 4 and 4A (pp11–14) deal with foreign loans and foreign equity, exchange rates and hedging. The Form 5 series (pp15–33) is the capital-cost block: admitted cost for existing projects, cost estimates and break-ups for new projects, construction/supply/service packages, and dedicated forms for cost overrun, time overrun and claims of additional RoE. Forms 6–10 (pp34–49) cover the financial package up to COD, project-specific loans, allocation of corporate loans, additional capitalisation after COD and during the fag end, de-capitalisation, exclusions, statements of capital cost and CWIP, and financing of additional capitalisation.

Forms 11–14A (pp50–62) build the annual computation — depreciation, weighted average interest on actual loans, normative loan interest, working capital interest, other income, incidental expenditure during construction and the draw-down schedule for IDC and financing charges. Forms 15A and 15B (pp63–66) give month-wise design energy with peaking capability or MW continuous. Form 16 (p67) is the liability flow statement.

Almost every form carries notes defining how an item is to be computed or evidenced — for example 'base exchange rate' as on 31.03.2014 for existing assets and as on COD for the remainder (pp36, 38).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Capital cost and investment

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document