Summary written by software. Check the regulator's original before you rely on it.
This is the draft Arunachal Pradesh State Electricity Regulatory Commission (State Grid Code) Regulations, 2018, issued by APSERC, Itanagar (p2). The notification publishes the draft for objections and suggestions to be received by 21 June 2018 and says the regulations will come into force 60 days after publication in the Arunachal Pradesh Official Gazette; the Gazette date is not printed (p2). It is the state-level grid code meant to be consistent with the Indian Electricity Grid Code (IEGC); where inter-state transmission provisions conflict, IEGC prevails (p7, p9).
Section 1 sets the general framework: objectives, scope over all Users, STU, SLDC, NERLDC and open access consumers, code structure, state grid description, responsibilities, confidentiality, dispute settlement, communication, government directives and compatibility with IEGC (pp7–9). Section 2 defines terms used across the code and lists applicable CEA/CERC codes and CBIP manuals (pp10–19). Section 3 assigns roles to SLDC, STU, transmission licensees, distribution licensees and generating companies; it introduces SAMAST and establishes the State Grid Code Review Committee, its composition, meeting frequency and the process for reviewing and amending the code (pp20–26).
Section 4 covers system planning: planning policy, security criteria, responsibility for load forecasting and generation capacity data, planning data categories and implementation of the transmission plan (pp27–31). Section 5 sets connection conditions: minimum technical, design and operational criteria; application and rejection procedure; connection agreements; site responsibility schedules; system performance, connection points, reactive power compensation, harmonics, communication and recording instruments; safety, cyber security, asset schedules and renewable energy connectivity (pp32–39). Section 6 is the operational planning code: system security, voltage and frequency management, demand estimation and management, demand control/disconnection, load crash handling, periodic reporting, operational liaison, outage planning and shutdown approval, recovery and restoration procedures, event reporting, major incident and accident reporting (pp40–53). Section 7 covers inter-user boundary safety: designated persons, permit-to-work and line clear permit procedures, safety standards, logs and the LCP formats (pp54–60).
Section 8 is the scheduling and despatch code: demarcation of responsibilities between SLDC, SGS and beneficiaries; the day-ahead and intra-day scheduling and despatch procedure; handling of revisions, curtailment priority, grid disturbance and transmission constraints; scheduling of solar and wind generation; and reactive power and voltage control including VAr exchange pricing and payment cases (pp60–72). Section 9 sets protection and metering requirements: general protection principles, fault clearance times and short-time ratings, generator, transmission line, transformer and sub-station protection, calibration/testing, data requirements and the metering code (pp72–78). Section 10 governs data registration: responsibility for data, changes, submission methods, treatment of unsupplied data and special requests (pp79–80). Section 11 covers dispute redressal, non-compliance and derogation, and the Commission's powers to remove difficulties, relax and amend the code (pp81–82). The appendices provide standard and detailed planning data formats, operational planning data, protection and metering data, the site responsibility schedule and an incident reporting form (pp83–107).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 18 May 2018Public notice: Draft State Grid Code Regulations, 2018 — Public Notice
Voltaic last read APSERC's website for final documents on 30 Sep 2026 and for drafts on 23 Nov 2026 (2 pages). A document APSERC issued after the page that lists it was read may not be held by Voltaic yet.