CERC · Central Electricity Regulatory Commission
Grant of Regulatory Approval for Execution of Inter-State Transmission Scheme to CTU Regulations, 2010
Central Electricity Regulatory Commission (Grant of Regulatory Approval for Execution of Inter-State Transmission Scheme to Central Transmission Utility) Regulations, 2010
RegulationDated 31 May 2010Published in the Gazette 7 Jun 2010F. No. L-1/41/2010-CERC dated 31st May, 2010
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a CERC principal regulation, notified on 31 May 2010 and carried in the Gazette of India of 7 June 2010 (p1, p4), that creates the route by which the Central Transmission Utility must obtain the Commission's regulatory approval before building an inter-State transmission scheme. The preamble (p4) grounds it in the CTU's Section 38(2)(c) duty to develop an efficient, coordinated and economical inter-State system and in Para 5.3.2 of the National Electricity Policy, which says prior agreement with beneficiaries is not a precondition to network expansion — the gap this regulation fills.
Regulations 1–2 (p4) give the short title, commencement from Gazette publication, and definitions — beneficiary, CTU, Generators, ISTS Scheme, National Electricity Plan, Project Inception Report and user. Regulation 3 (p4–5) scopes the regulation to ISTS schemes where generators have sought long-term access but PPAs with all beneficiaries are unsigned, and to system-strengthening schemes, and excludes schemes already covered by signed Bulk Power Transmission Agreements.
Regulation 4 (p5) sets the filing procedure: application with a Project Inception Report conforming to Appendix I, coordination with the bodies named in Section 38(2)(b), website posting within seven days, and a two-newspaper notice inviting objections within one month. Regulation 5 (p5) lists the evaluation criteria — need (technical justification, urgency, prudence), cost assessment and phasing, and cost-benefit to users. Regulation 6 (p5–6) sets what the Commission may do — approve with modifications or conditions, reject with reasons, or require a fresh application — with a proviso letting the CTU proceed on minor scope changes under intimation, and rules on sequencing implementation against generation projects.
Regulations 7–9 (p6) deal with recovery of transmission tariff under the prevailing Section 61 tariff regulations, the sharing methodology to be specified from time to time, the Commission's power to relax, and its power to remove difficulties. Appendix I (p6) gives the application format in two parts.
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.