Summary
Summary written by software. Check the regulator's original before you rely on it.
The Andhra Pradesh Electricity Regulatory Commission issued this principal regulation to govern how captive, cogeneration and renewable energy (RE) power plants connect to and evacuate power into the AP grid. It was preceded by proposals from APTRANSCO and the two DISCOMs (APEPDCL and APSPDCL) and a public consultation on a draft hosted on the Commission’s website (p1). The Commission makes it under the Electricity Act 2003, the National Electricity Policy and the National Tariff Policy (p1).
Sections 1–3 set out the background, legal authority, short title, commencement and extent. The regulation comes into force from the date of publication in the Andhra Pradesh Gazette and applies to distribution licensees, transmission licensees, captive generating plants, cogeneration power plants and all RE source power plants; it prevails over inconsistent APERC regulations, orders or practice directions (p2).
Section 4 defines key terms, including the Act, APTRANSCO, captive generating plant, cogeneration, dedicated feeder/line, power evacuation, renewable energy sources and year (p2–3). Section 5 requires generating plants, substations, tie lines and dedicated transmission lines to follow CEA technical and safety standards and the AP Electricity Grid Code or Indian Electricity Grid Code (p3). Section 6 addresses where and how projects connect: independent projects to the nearest APTRANSCO/DISCOM grid substation, and clustered solar/wind farms from their pooling bus/substation via 11 kV, 33 kV or EHT lines (p3–4).
Section 7 sets the basis for conductor capacity calculations—thermal loading limits, ambient temperature and maximum conductor temperature for ACSR and AAAC—and says the listed conductor types are illustrative and equivalent conductors may be used (p4). Section 8 caps evacuation capacity by voltage level and substation type, sets per-circuit loading limits for wind versus other plants, requires DISCOMs/APTRANSCO to augment transformer, bus bar or bay capacity within stated timelines, specifies a wind-speed assumption for non-wind projects, states that the N-1 criterion is not applied to immediate solar/wind connectivity, and requires wind and solar farms to maintain a specified absorbing power factor at the grid interconnection point through reactive compensation (p4–5).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.