Skip to content

TSERC · Telangana State Electricity Regulatory Commission

Electricity Supply Code, 2004 — Third Amendment, 2026 — Draft

Telangana Electricity Regulatory Commission (Third amendment to Regulation 5 of 2004 being Andhra Pradesh Electricity Regulatory Commission (Electricity Supply Code) Regulation 2004), Regulation, 2026

Draft amendmentDated 13 Apr 2026

Draft

A proposal that has since been finalised as the Electricity Supply Code, 2004 — Third Amendment Regulation, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A short, three-page draft from the Telangana Electricity Regulatory Commission that would make a single-clause change to the Electricity Supply Code it inherited from the erstwhile Andhra Pradesh commission. The preamble sets out the lineage: the Principal Regulation is Regulation No.5 of 2004 (APERC Electricity Supply Code Regulation 2004), notified 17.03.2004 under Section 50 of the Electricity Act 2003, amended in 2006 and again by Regulation No.7 of 2013, and carried into Telangana by the adoption Regulation No.1 of 2014 notified 10.12.2014 (p1–2).

The trigger is a proposal from TGSPDCL to amend clause 4.7.3 so as to remove the disparity between the interest charged on outstanding bills when instalments are granted under the Tariff Order and the interest payable by the distribution companies to consumers for erroneous billing (p2). The Commission's stated aim is uniformity between the two rates, and it says it will consider stakeholder and licensee suggestions and may add or amend provisions before finalising (p2).

Operatively, clause 1 gives the short title, extends the regulation to the whole State and ties commencement to Gazette publication (p2). Clause 2 substitutes clause 4.7.3: the new text carries the revised-bill procedure for erroneous billing — a revised bill with a revised due date fixed not earlier than seven days from delivery, refund of any excess by adjustment in subsequent bills, and interest to the consumer at 18% per annum on the excess amount outstanding from wrong billing (p2–3). The order is signed by the Commission Secretary, dated 13.04.2026 at Hyderabad (p3).

Standard name
Electricity Supply Code
Primary topics
Billing and payment

Read with this

Voltaic does not hold the regulation itself.

Amendments and corrections

Other copies of these documents (1)

Earlier drafts

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document