The Meghalaya State Electricity Regulatory Commission made these regulations (Regulation 2 of 2009, Notification No. MSERC/Regn-02/2009) under s.181(2) read with s.32(3) of the Electricity Act 2003 to set out how the State Load Despatch Centre recovers its costs from the grid users it despatches (p1). They were earlier published as a draft in the Gazette of Meghalaya issue dated November 27, 2008, and come into force from the date of publication in the Gazette of Meghalaya, though only the year 2009 is printed (p1).
Regulation 1 states the short title, commencement and extent: the regulations apply to intra-State transmission licensees and to generating stations monitored and despatched by the SLDC, and expressly exclude generating stations up to and including 5 MW installed capacity (p1). Regulation 2 defines the Act, billing month, Commission, financial year, intra-State transmission system, State Government, SLDC and state transmission utility, with residual definitions from the Electricity Act 2003 (p1–2).
Regulation 3 requires every covered generator and transmission licensee to register with the SLDC before connection (or, if already existing, to register), on an application with a fee, and sets out the expense heads that go into SLDC charges and the basis on which the annual charges are allocated — first equally between generators and transmission licensees, then to individual generators by installed capacity and to transmission licensees by MW-kilometres of network (p2–3).
Regulation 4 governs the SLDC's annual revenue requirement filing: timing ahead of the financial year, prescribed Annexure formats, prior Commission approval for capital projects above a stated cost, petition in six sets, Commission scrutiny and information calls, validity of determined charges until the next revision, a percentage-variation trigger for seeking revision, carry-forward of shortfall or excess, and periodic returns (p3–4). The form and methodology for the charges themselves sit in Annexures 1–13. Regulation 5 covers monthly billing, payment periods, penal interest on late payment, first-charge priority, and dispute resolution through the Commission (p4). Regulation 6 preserves the Commission's general powers to make orders, vary procedure and deal with matters not covered by regulations (p5).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read MSERC's website for final documents on 26 Nov 2026 and for drafts on 21 Nov 2026. A document MSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MSERC's website on 26 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.