Skip to content

CSERC · Chhattisgarh State Electricity Regulatory Commission

Chhattisgarh Standards of Performance in Distribution of Electricity Regulations, 2020

Chhattisgarh State Electricity Regulatory Commission (Standards of Performance in Distribution of Electricity) Regulations, 2020

RegulationDated 15 May 2019No. 86/CSERC/2020 dated l5th May 2019

1 amendment to it is on Voltaic, dated 2 Aug 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Chhattisgarh State Electricity Regulatory Commission has issued principal regulations under the Electricity Act 2003 (ss 181(2)(za) and (zb) read with s 86(1)(i) and ss 57 and 59) to set standards of performance for distribution licensees in the State (p2). They apply to all distribution licensees and deemed licensees in Chhattisgarh and extend to the whole State; they come into force on publication in the Chhattisgarh Rajpatra, though no Gazette date is printed (p2).

The regulation states objectives, defines terms by voltage and area categories, and creates a two-tier framework of guaranteed and overall standards (p2–3). Schedule I contains guaranteed standards for restoration of supply after fuse-off, line breakdown, transformer failure, burnt meters and cable faults; quality-of-supply limits for voltage and harmonics; meter inspection and replacement; new connection and additional load timelines; transfer and conversion; billing complaints; load reduction; and reconnection after disconnection (p5–8). Schedule II requires reliability indices SAIFI and SAIDI, gives computation formulae and exclusions, and sets monthly targets differentiated by Class-A cities, urban and rural areas (p9–10).

The Annexure to Schedules I and II prescribes compensation payable for each default, and clauses 4–8 lay out payment, recovery from responsible employees, exclusion from ARR, consumer claim procedure via Form A, escalation to the Consumer Grievance Redressal Forum and Electricity Ombudsman via Form B, and reporting duties (p4–5, p10–16). A separate schedule sets overall service-level percentages and annual caps for transformer failures, faulty meters, billing and collection efficiency (p13–14). The Commission can grant force majeure relief, issue practice directions, remove difficulties and amend the regulations; it repeals the 2006 standards regulations with savings (p5). The English original prevails over the Hindi version (p5).

Standard name
Standards of Performance
Primary topics
Standards of performance, Power quality, New connections and load changes

Read with this

3 more documents belong here and are not on Voltaic: 3 copies in another language.

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cserc.gov.in ↗

Report an issue with this document