MERC · Maharashtra Electricity Regulatory Commission
Specific Conditions of Distribution License for SEZ Bio-Tech Services, Hadapsar SEZ, Regulations, 2024
Maharashtra Electricity Regulatory Commission (Specific Conditions of Distribution License applicable to M/s. SEZ Bio-Tech Services Pvt. Ltd. for the sector specific SEZ for Biotech and Pharmaceuticals Sectors at Hadapsar Village, District Pune) Regulations, 2024
RegulationDated 23 Jul 2024No. MERC/TEC/ Licence Conditions/SEZ Bio-Tech-Hadapsar /2024-25 dated 23rd July 2024
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a MERC notification making the specific distribution-licence conditions for M/s SEZ Bio-Tech Services Pvt. Ltd., the deemed distribution licensee for the sector-specific SEZ for biotech and pharmaceuticals at Hadapsar, Pune (p6). It is short and self-contained: the operative text runs from the short title to the power to remove difficulties (p6–8), with a map annexed as Schedule I (p9). The Gazette cover and any preamble pages 1–5 are not included.
Regulation 1 gives the title, confines the instrument's reach to the SEZ areas described in two Government of India SEZ notifications, and provides that it comes into force on publication in the Official Gazette (p6). Regulation 2 defines the Act, Co-Developer, Developer, Deemed Distribution Licensee, General Conditions, M/s SEZ Bio-Tech and the SEZ Rules (p6–7). Regulation 3 states that these Specific Conditions read with MERC's General Conditions of Distribution Licence, 2006 are the conditions of the licence and govern the licensee's distribution and retail supply (p7).
Regulation 4 fixes the area of supply and makes the deemed-licensee status co-terminus with the developer's SEZ approval — de-notification, suspension or termination as co-developer, or lease expiry ends the status — and requires the licensee to approach the Commission within 15 days of such an event for amendment, revocation or interim supply directions (p7). Regulation 5 sets a 25-year term from 8 December 2023 to 7 December 2048, tied to Order in Case No. 180 of 2023 (p7). Regulations 6–7 require public inspection of the licence and clearances and 24-hour uninterrupted supply (p7–8). Regulations 8–9 reserve the Commission's power to amend the Regulations and to remove difficulties by order (p8).
Read with this
Commencement notices and reasons
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.