TNERC · Tamil Nadu Electricity Regulatory Commission
Deviation Settlement Mechanism and related matters Regulations, 2017 — Draft
Tamil Nadu Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) Regulations, 2017
Draft amendmentDated 28 Dec 2017Draft Notification No.TNERC/DSM/ dated dt. .12.2017
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft notification of the Tamil Nadu Electricity Regulatory Commission's principal Deviation Settlement Mechanism Regulations, 2017, published for objections or suggestions by 27.01.2018 (p1). It is proposed under sections 86(1) and 181(2)(zp) read with sections 32 and 33 of the Electricity Act, 2003 (p1).
Regulations 1–2 deal with commencement and definitions. The regulations are to come into force on Gazette publication, but commercial arrangements and related deviation charges and penalty are deferred by six months (pp1–2). The definitions establish the key actors and concepts: State Entity, deviation, Deviation Settlement Mechanism, buyer and seller, time-block, full and partial open access consumers, and gaming (pp2–5). Regulation 3 states the objective of grid discipline and grid security through a commercial deviation mechanism (pp5–6). Regulation 4 makes the framework applicable to scheduled short-, medium- and long-term open access transactions using the intra-State transmission or distribution system, including inter-State wheeling, while excluding wind and solar generators (governed by a separate 2017 regulation) and excluding full and partial open access consumers from the DSM pool, with their overdrawal settled with the distribution licensee (pp6–7).
Regulations 5–9 set duties for SLDC and State Entities, energy accounting, the design parameters of the DSM, scheduling declarations and treatment of gaming. SLDC is to prepare monthly time-block accounting and weekly deviation statements, and the DSM framework specifies 96 fifteen-minute blocks, frequency operating range, weekly settlement, measurement units, price vector, volume limits and loss allocation (pp7–14).
Regulations 10–14 specify the charge for deviation by reference to the CERC 2014 price vector reproduced in Annexure I, with caps, zero-charge conditions and infirm-power treatment; set volume limits and additional deviation charges; require compliance with SLDC instructions; and create the State Deviation Pool Account with payment timelines, interest, letter-of-credit cover and an appropriation waterfall (pp14–27). Regulations 15–19 provide for a State Power Committee and the Commission's powers to amend, remove difficulties, relax and issue directions (pp27–28). Annexure I contains the frequency-linked price vector and inter-State open access multipliers; Annexure II contains additional deviation charge tables; and the Explanatory Statement gives the rationale (pp29–38).
Read with this
Voltaic holds no final regulation made from this draft.
No other documents to read with it are on Voltaic.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.