Skip to content

SSERC · Sikkim State Electricity Regulatory Commission

Framework for Resource Adequacy Regulations, 2025

Sikkim State Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025

RegulationDated 1 Apr 2025Published in the Gazette 2 Apr 2025No. 434/SSERC/2024-25/01 dated 01.04.2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on sserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

These are SSERC's principal regulations for a state resource adequacy framework in Sikkim, notified under Electricity Act 2003 sections 181, 61, 66 and 86 and published in the Sikkim Gazette on 2 April 2025 (p1). They commence on notification in the Official Gazette and extend to the whole State (p1). Chapter 1 defines terms and scope: they bind generating companies, distribution licensees, SLDC, STU and other grid-connected entities in Sikkim (p1–3). Chapter 2 establishes the framework's four steps — demand assessment and forecasting, generation resource planning, procurement planning, and monitoring and compliance — and requires the distribution licensee to prepare ten-year LT-DRAP, five-year MT-DRAP and one-year ST-DRAP plans (p3). Chapter 3 details demand assessment and forecasting: long- and medium-term forecasts by consumer category with specified modelling choices and scenario analysis, short-term hourly/sub-hourly forecasting and state-level aggregation through SLDC, with annual submission deadlines (p3–6). Chapter 4 covers generation resource planning: mapping contracted, upcoming and retiring resources; computing capacity credit factors, including a net-load-based method for RE; setting planning reserve margin through reliability indices; and identifying resource gaps for RA allocation (p6–8). Chapter 5 sets procurement planning: optimal resource mix, least-cost optimisation, procurement type and tenure with regional preference and contracting horizons, and capacity sharing (p9–10). Chapter 6 provides monitoring and reporting of state-aggregated shortfalls and non-compliance charges (p10). Chapter 7 sets data-sharing obligations and annual timelines for licensees, SLDC and STU (p10–11). Chapter 8 gives the Commission powers to direct, relax and remove difficulties (p11).

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs

Read with this

No other documents to read with it are on Voltaic.

Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of SSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on sserc.org ↗

Report an issue with this document