SSERC · Sikkim State Electricity Regulatory Commission
Framework for Resource Adequacy Regulations, 2025
Sikkim State Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025
RegulationDated 1 Apr 2025Published in the Gazette 2 Apr 2025No. 434/SSERC/2024-25/01 dated 01.04.2025
Summary
Summary written by software. Check the regulator's original before you rely on it.
These are SSERC's principal regulations for a state resource adequacy framework in Sikkim, notified under Electricity Act 2003 sections 181, 61, 66 and 86 and published in the Sikkim Gazette on 2 April 2025 (p1). They commence on notification in the Official Gazette and extend to the whole State (p1). Chapter 1 defines terms and scope: they bind generating companies, distribution licensees, SLDC, STU and other grid-connected entities in Sikkim (p1–3). Chapter 2 establishes the framework's four steps — demand assessment and forecasting, generation resource planning, procurement planning, and monitoring and compliance — and requires the distribution licensee to prepare ten-year LT-DRAP, five-year MT-DRAP and one-year ST-DRAP plans (p3). Chapter 3 details demand assessment and forecasting: long- and medium-term forecasts by consumer category with specified modelling choices and scenario analysis, short-term hourly/sub-hourly forecasting and state-level aggregation through SLDC, with annual submission deadlines (p3–6). Chapter 4 covers generation resource planning: mapping contracted, upcoming and retiring resources; computing capacity credit factors, including a net-load-based method for RE; setting planning reserve margin through reliability indices; and identifying resource gaps for RA allocation (p6–8). Chapter 5 sets procurement planning: optimal resource mix, least-cost optimisation, procurement type and tenure with regional preference and contracting horizons, and capacity sharing (p9–10). Chapter 6 provides monitoring and reporting of state-aggregated shortfalls and non-compliance charges (p10). Chapter 7 sets data-sharing obligations and annual timelines for licensees, SLDC and STU (p10–11). Chapter 8 gives the Commission powers to direct, relax and remove difficulties (p11).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of SSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.