SSERC · Sikkim State Electricity Regulatory Commission
Terms and Conditions for Determination of Tariff for Generation, Transmission, Wheeling and Distribution & Retail Supply under Multi Year Tariff Framework Regulations, 2020
Sikkim State Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Generation, Transmission, Wheeling and Distribution & Retail Supply under Multi Year Tariff Framework) Regulations, 2020
RegulationDated 7 Sep 2020Published in the Gazette 9 Sep 2020No.14/SSERC/MYT/AMDT/2015/19 dated th September , 2020
Summary
Summary written by software, from pages 1 to 35 of 160. Check the regulator's original before you rely on it.
This notification publishes the SSERC's 2020 multi-year tariff regulations for Sikkim, issued 7 September 2020 and gazetted 9 September 2020 (p1). They come into force on gazette publication, extend to Sikkim, and apply to tariff determination from 1 April 2021 onward for existing and future generating companies, transmission licensees and distribution licensees (p1). Chapter 1 defines core terms and fixes scope: generation supply to distribution licensees, transmission, wheeling and retail supply, and other cases within Commission jurisdiction; renewable energy generation is carved out for the separate 2012 RE tariff regulations, and the 2013 MYT Regulations and the 2015 and 2017 amendments are superseded (p13).
Chapter 2 sets the MYT framework. It establishes the second control period from 1 April 2021 to 31 March 2024, annual determination of ARR and tariff for each financial year, tariff for the first control-period year, and separate orders for later years (p14–15). FY 2019-20 truing up and FY 2020-21 annual performance review remain under the earlier 2013/2017 framework (p16–17). Filings must be supported by audited accounting statements, and businesses must be segregated; until complete accounting separation, an allocation statement is required, with full segregation within one year (p17).
Regulations 6–8 specify tariff principles, the contents of the Capital Investment Plan and Business Plan, MYT application requirements, ARR forecasts, and Commission acceptance or rejection of applications (pp18–25). Regulations 9–12 set out truing up, identification of controllable and uncontrollable factors, pass-through of uncontrollable gains or losses, and sharing of controllable gains or losses (pp26–29). Regulations 13–15 cover tariff determination, generation tariff for existing, new and own generating stations, and transmission, distribution wires and retail supply tariff, referring to Chapters 4, 5 and 6 (pp30–31). The remaining regulations address filing formats and appendices, publication of applications, public hearing, the tariff order timeline, publication of the order, review, adherence to tariff, and annual tariff determination (pp32–35).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of SSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.