GERC · Gujarat Electricity Regulatory Commission
Distribution Licence Regulations, 2005
Gujarat Electricity Regulatory Commission (Distribution Licence) Regulations, 2005
RegulationDated 30 Mar 2005
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Gujarat Electricity Regulatory Commission (Distribution Licence) Regulations, 2005 govern how a distribution licence is applied for, granted, amended, revoked and suspended in Gujarat, and the general conditions that attach to every such licence. They are made under s.181 read with ss.15, 16 and 18 of the Electricity Act, 2003 and s.65 read with ss.20 and 22 of the Gujarat Electricity Industry (Reorganisation and Regulation) Act, 2003, apply to the whole State, and come into force on a date to be notified by the Commission (p1–2).
Chapter 2 fixes the working vocabulary — Applicant, Area of Licence, Distribution Licence, Licensed Business and Other Business — and allows the Commission to review the Regulations to harmonise with open access regulation and the development of power markets under s.66 (p2–4).
Chapter 3 is the procedural spine (p4–22). It prescribes the application form in Schedule-I with its enclosures, the fee route and manner of filing, receipt and acknowledgement, a newspaper public notice requirement in one English and two Gujarati dailies with a 30-day objection window and confidentiality carve-outs, public inspection of the application, scrutiny and calls for additional information, objections and suggestions, local inquiry, and the hearing and grant or refusal of the licence (with an indicative 90-day timeline and a pre-grant publication of the proposal). It then deals with applications inside an existing licensee's area of supply, commencement and 25-year duration of the licence, deposit of maps and licence copies, amendment (licensee-initiated or suo motu, with Central Government consent for defence areas), grounds and procedure for revocation, suspension for up to a year with an Administrator, and initial and annual licence fees with interest on default (p4–22).
Chapter 4 sets the general conditions of every licence (p22–45): duty to develop and maintain an efficient distribution system; supply on demand; recovery of expenditure; security; non-discriminatory open access; bans on subsidy and undue preference; prior consent for acquisitions, mergers and transfers; conditions for Other Business and separate accounts; franchisee arrangements; anti-competitive conduct; compliance with codes and directions; standards of performance and compensation; cooperation with the STU and SLDC; metering; disconnection for non-payment; protection of railways, highways and telegraph lines; powers of entry; incident and change reporting; accounts and audit; and the Commission's powers to regulate supply, investigate, introduce competition in the same area, and set tariffs through the Tariff Regulations. Regulation 45 extends these conditions to deemed licensees under the first, third and fifth proviso to s.14 (p45).
Chapter 5 contains savings preserving the Commission's freedom to depart from its own procedure and a power to remove difficulties (p45–46). Schedule-I is the application form with financial, credit-standing, organisational and five-year business-plan disclosures (p47–51); Schedule-II is the form of the distribution licence itself, carrying the 25-year term, non-transferability and non-exclusivity (p52–53).
Read with this
No other documents to read with it are on Voltaic.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.